My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10457
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10457
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:13:02 PM
Creation date
10/12/2006 4:20:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8282.600.10
Description
Colorado River Operating Annual Reports
Basin
Colorado Mainstem
Date
1/1/1989
Author
USDOI/BOR
Title
Operation of the Colorado River Basin 1989 Projected Operations 1990
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Power Operations and Major Maintenance Activities <br /> <br />Upper Basin - Colorado River Storage Project <br /> <br />During water year 1989 the Blue Mesa generators were <br />upraled and Siemans-Allis Corporation completed work on <br />the Crystal turbine replacement in January 1989, Morrow <br />Point generators are scheduled for uprating during water year <br />1990, <br /> <br />The following table summarizes CRSP generation, purchases, <br />disposition, and revenues from power operations for fiscal <br />year 1989, and present projections for fiscal year 1990. A <br />breakdown by percent of power sources, disposition, and <br />revenues for the fiscal year is shown on the opposite page, The <br />total revenue from power operations in fIScal year 1989 was <br />$79,875,973, <br /> <br />CRSP Power Generation <br /> <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.