My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10453
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10453
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:13:00 PM
Creation date
10/12/2006 4:20:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.114.I
Description
Dolores Participating Project
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
5/9/1977
Author
USDOI-BOR
Title
Final Environmental Statement - Dolores Project-Colorado
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CONTENTS (Continued) <br /> <br />D. MITIGATING MEASURES AND AIR AND WATER QUALITY ASPECTS <br />(continued) <br />3. Measures incorporated in project design and <br />operation (continued) <br />e. Preservation of scenery. . . . . . <br />f. Protection from hazards. . . . . " . . . <br />g. Land acquisition and relocation of families. <br />4, Measures designed to control the overall salinity levels <br />in the Colorado River. <br /> <br />E. UNAVOIDABLE ADVERSE EFFECTS <br /> l. Water resources. . . . . <br /> 2. Fish and wildlife, . . <br /> 3. Historical and archaeological sites. <br /> 4. Scenery. . . . . . . . . . <br /> 5. Economic and social conditions <br /> 6. Boating. . . . . . . . . . <br /> <br />F. SHORT- AND LONG-TERM ENVIRONMENTAL USES . <br />1. Short-term gains compared to long-term losses. <br />2. Short-term losses compared to long-term gains. <br />3. Relationships between project development and future <br />options for resource development . . . . . . . . <br /> <br />G. IRREVERSIBLE AND IRRETRIEVABLE COMMITMENT OF RESOURCES. <br /> <br />H. ALTERNATIVES TO THE PROPOSED PLAN . <br /> <br />1. General............ <br />2. Modifications of proposed plan <br />a. Project plan at authorization. <br />b. Addition of Plateau Creek Reservoir to proposed <br /> <br />plan. . . . . . . . . . . . . . . . <br />c. Addition of Slick Rock Reservoir to proposed plan. <br />d. Substitution of Forks Reservoir for McPhee <br /> <br />Reservoir. . . . . . . . . . . . . <br />3. Alternative uses of water. . . . . . . . . . . <br />a. Development of i,rrigation water only . . . <br />b. Development of municipal and industrial water <br /> <br />only. . . . . . . . . . . . . . . . . . <br />c. Stream improvement only. . . . . . . . . . <br />d. Stream improvement and white-water boating <br />4, Nondevelopment.... <br /> <br />I. CONSULTATION AND COORDINATION <br />1. Development of the proposals <br />2. Preparation and review of the Draft Environmental <br />Statement. . . . . . . . . . <br />a. Preparation of statement . <br />b. Distribution of statement. <br /> <br />iv <br /> <br />Page <br /> <br />D- 4 <br />D- 4 <br />D- 4 <br />D- 5 <br />E- I <br />E- 1 <br />E- 1 <br />E- 2 <br />E- 2 <br />E- 2 <br />E- 2 <br />F- I <br />F- 1 <br />F- I <br />F- 2 <br />G- 1 <br />H- I <br />H- I <br />H- I <br />H- I <br />H- 5 <br />H- 6 <br />H- 7 <br />H- 8 <br />H- 8 <br />H- 9 <br />H-I0 <br />H-I0 <br />H-ll <br />I- I <br />I- I <br />I- I <br />I- I <br />I- I <br />
The URL can be used to link to this page
Your browser does not support the video tag.