My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10452
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10452
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:12:59 PM
Creation date
10/12/2006 4:20:29 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.21
Description
UCRBRIP Hatchery Facilities
State
CO
Basin
Colorado Mainstem
Date
1/1/1983
Author
US Fish & Wildlife S
Title
Colorado River Endangered Fish Hatchery Feasibility Study
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />c. Renegotiate the MOU with Region 2 to obtain 150,000 (2-3 inch) <br />Colorado squawfish, 50,000 (2-3 inch) humpback chub and 50,000 <br />(2-3 inch) bony tail chub on a first priority basis 1985 thru 1988 to <br />meet the needs of the CP and Windy-Gap work. An additional 1 to 3 million <br />sac-fry may be needed for testing the "larval drift" and "imprinting" <br />theories. <br /> <br />Oct-Nov-~Renegotiate MOU through Regional offices <br /> <br />June-Sept--Experimental fish shipped to laboratories for CP <br />controlled studies. <br />Windy-Gap fish nose-tagged, and released in Upper <br />Co 1 orado Ri vel". <br /> <br />Cost estimates-FY 1984 by station. <br />Ouray NWR <br />1. Fund on-site engineering evaluation <br />Estimated cost - $50,000 <br />Overhead (32%) - 16,000 <br />Total - $66,000 Man years - 0.5 <br /> <br />2. Fund fish culture study <br />Estimated cost - $25,000 <br />Overhead (15%) - 3,750 <br />Total $28,750 Man years - 0.6 <br /> <br />Fish Spl"ings NI-JR <br />1. Fund on-site engineering evaulation <br />Estimated cost - $50,000 <br />Overhead (32%) - 16,000 <br />Total - $66,OOOt1an years-0.5 <br /> <br />2. Fund fish culture study <br />Estimated cost - $25,000 <br />Overhead (15%) - 3,750 <br />Total - $28,750 <br /> <br />Man years-0.6 <br /> <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.