Laserfiche WebLink
<br />I <br />I <br /> <br />, i <br /> <br />, , <br />T <br /> <br />I <br /> <br />I <br />I <br /> <br />( <br /> <br />'-\~i <br /> <br />r <br /> <br />I <br />J <br />:,',.1 <br /> <br />.,,',' <br /> <br />I <br /> <br />:-:1 <br />,( <br /> <br />r; <br /> <br />..,' <br />"I <br /> <br />Ii,' <br /> <br />91 <br /> <br />'I <br /> <br />'>1 <br /> <br />I <br /> <br />',-! <br /> <br />"')' <br />.. <br /> <br />~ <br /><::) <br />(-, <br />(,,1 <br />"-1 <br />-.J <br /> <br />RESER.VOIR <br /> <br />Lak.e Granby <br />Willow CreeK Reservoir <br /> <br />Williams Fork Reservoir <br /> <br />Green Mount~in R.eservoir <br /> <br />billonReservoir <br /> <br />Homestake Reservoir <br /> <br />Ruedi ReJ;lervoir <br /> <br />TABLE!5.1 <br />EXISTI~G RESERVOIRS <br /> <br />TOTAL <br />STORAGE <br />(at) <br /> <br />539,760 <br /> <br />10,553 <br /> <br />96,820 <br /> <br />153,639 <br /> <br />254,000 <br /> <br />43,5.00 <br /> <br />102,369 <br /> <br />MINIMUM <br />POOL <br />(af) . <br /> <br />74,190 <br /> <br />6,675 <br /> <br />3,183 <br /> <br />6,860 <br /> <br />3,270 <br /> <br />o <br /> <br />1,089 <br /> <br />In addition, reservoirs simulated under future' development <br />scenarios are: Rock Creek Reservoir, planned J:>y the. CRWCD: Iron <br />Mountain Reservoir for the Red Cliff project; Kendig Reservoir for <br />the West Divide Proj ect; and Main Elk Reservoir for oil shale <br />development. Maj or operating rules incorporated in the BESTSM are <br />as follows: <br /> <br />The. Grand Valley demand measured at the Cameo gage was. <br />aSSUmed to equal 1650 cfs. from April to OctoJ:>er of each <br />year and 800 cfsfrom November to March. <br /> <br />. <br /> <br />· The Shoshone Hydroelectric Power Plant demand measured at <br />Ootsero is equal. to 1250 cfs all y,ear long. <br /> <br />5-2 <br />