Laserfiche WebLink
<br />',1":" <br /> <br />I <br />"I <br />',J <br />a <br />"',,0 <br />I c-' <br /> <br />r ~ <br />oc <br /> <br />"f;.,) <br /> <br />" <br /> <br />'r" <br /> <br />I <br /> <br />",'! <br /> <br />Hi <br />'I' <br />fj , <br /> <br />r <br /> <br />';." <br />,,-, <br /> <br />I <br />I'; <br /> <br />l' <br />"'. <br />"'.', <br />~',-:~ <br /> <br />l' <br />r <br /> <br />r <br /> <br />r <br /> <br />, ,: <br />t.-; <br /> <br />I <br /> <br />lID <br /> <br />l3al..lle EncllneerlnQ Car/:1aratlan <br /> <br />Suite 200 <br />165 South Union <br />Lakewood, Colorado 80228 <br /> <br />conSUltlnQ enQlneets <br /> <br />303/987-3443 <br /> <br />Colorado Water Resources and <br />Power Development Authority <br />Attention: Mr. Dan Law, Associate Director <br />1580 Logan street, suite 620 <br />Denver, Colorado 80203 <br /> <br />August 28, 1986 <br /> <br />RE: JOINT-USE RESERVOIR AND GREEN MOUNTAIN EXCHANGE <br />PROJECTS. SUMMARY REPORT OF HYDROLOGIC ANALYSIS <br /> <br />Dear Mr. Law: <br /> <br />We are pleased to submit this report summarizing the results of <br />the preliminary hydrologic analysis performed as part of the <br />Phase 2 investigation of the Joint-Use Reservoir and Green <br />Mountain Exchange Projects. <br /> <br />Phase 1 of the Joint-use Reservoir and Green Mountain Exchange <br />Projects involved the initial screening analysis. It was <br />designed to eliminate at an early stage, those reservoir sites <br />that would not be suitable for a joint-use or replacement <br />reservoir. The Initial Screening Report summarizing the results <br />of Phase 1 was submitted on January 22, 1986. <br /> <br />Phase 2 involves the detailed hydrologic, operational and water <br />rights analysis of the remaining sites and a recommendation of <br />sites for Phase 3 analysis. Phase 3, the reconnaissance study <br />phase will involve detailed geotechnical investigations and <br />preliminary design and cost estimates. <br /> <br />As a part of Phase 2, we have evaluated six reservoir sites <br />including Wolford Mountain site A', Wolford Mountain Site C, Red <br />Mountain, Wolcott, Azure and Una Reservoir sites to determine <br />their ability to meet the Project requirements. The analyses <br />show that all six reservoir sites can produce the necessary <br />yield to meet the Joint-Use Reservoir requirements <br />(approximately 30,000 af). In addition, Wolcott Reservoir alone <br />