My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10444
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10444
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:12:58 PM
Creation date
10/12/2006 4:20:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.400
Description
Colorado Big Thompson Project - Reports
State
CO
Basin
South Platte
Water Division
1
Date
8/1/1986
Author
Colo. Water Resource
Title
Summary Report - Preliminary Hydrologic Analysis
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />':.J <br />1"1. <br />",J <br /> <br />I., <br />'-., <br />, <br />).-J <br />[ <br />;:-,i <br />,; <br /> <br />" <br />['1 <br /> <br />",_~-11 <br />{-'.J <br />.',:, <br /> <br />r" <br /> <br />;::~~ <br /> <br /> <br />~ <br />L <br />(.,' <br /> <br />j}' <br /> <br />i:'_'j <br /> <br />I <br /> <br />I <br /> <br />T <br />~"ir'. <br />t>i <br />I <br />r <br /> <br />1 <br /> <br />I <br /> <br />I. <br /> <br />"-" <br /> <br />I <br /> <br />a <br />a <br />c-' <br />~, 3.0 P~OJECT RESE~VOIRS <br />en <br />tv <br /> <br />3.1 RESERVOIRDESCRIPTION <br /> <br />The hydrologic analyses performed as, part of the Phase 2 <br />investigation entailed esti,mating the yields fGr six single <br />reservoirs and three combinations of reservoirs and, performing an <br />operation anaJ.ysis to evaluate their replacementcapabiJ,.ities for <br />the Green, Mountain Exchange Project. Table 3.1 Shows the site <br />storage capacity for each reservoir and combination. A brief <br />descri,ptio,n of the reservoirs are provided below.. The . average <br />annual flowsme,ntioned. in the subseqUent 'paragraphs are bas'ed . on <br />historical flows for the period of 1951 through 1985. <br /> <br />Wolford Mountain .site' A I - The site is located on Muddy Creek, <br />approximately 1.5 miles upstream from Kremmling. The reservoir <br />inflow is to be supplemented with pumping from the Colorado River <br />during the snowmelt runoff season. Two alternative, sites for <br />pumping intake were considered: one immediately upstream of the <br />'Blue River and the other downstream of the Blue R.iver. The average <br />annual historical flow of Muddy Creek at the site is approximately <br />64,000 af. The average annual histbl;"ical flows at the proposed <br />diversion sites above and below the Blue River are 357,000 and <br />678,000 .af respec,tively. <br /> <br />Wolford Mountain site C -Thie site is. located, on MUddy Creek, <br />approximately 4 miles nO,rth of Kremmling. Muddy Creek flows at <br />both site A' and C are considered to be approximately the same <br />since no major tributaries contribute to Muddy Creek in this reach. <br /> <br />Red Mountain site - This site is located on <br />. approximatelY 1 mile east. of Kremmling. <br />historical flow at this site is 357,OOOaf. <br /> <br />the Colorado River, <br />The averag,e annual <br /> <br />3-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.