My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10443
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10443
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:12:57 PM
Creation date
10/12/2006 4:20:24 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8281.200
Description
Colorado River Studies and Investigations -- Colorado River Management Plan
Basin
Colorado Mainstem
Water Division
5
Date
12/1/1981
Author
National Park Serv
Title
Colorado River Management Plan and Annual Operating Requirements -- Grand Canyon
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />'t.'::>) <br /> <br /> <br />4. <br /> <br />Concession Economics <br /> <br />iN' <br />~..., <br />t;;l<. <br />"'~, <br />""-" <br /> <br />There has been considerable concern over the alloca- <br />tion of user days as they relate to the economic <br />viability of concessioners. Concession economics will <br />continue to be analyzed by the N PS. This information <br />will be especially useful in equitably reallocating user <br />days should total USe on the river need to be adjusted. <br />The N PS will seek concessioner cooperation and input <br />in obtaining a better understanding of their economic <br />situations. <br /> <br />Reviewing and <br />Updating the Plan <br /> <br />The N PS will review and analyze the information from the <br />ongoing monitoring program. Based on this information, the <br />Colorado River Management Plan will be updated or modi- <br />fied as necessary. Updating and/or modification could <br />include adjustments in use levels and reallocation of use <br />between commercial and noncommercial trips. Any adjust- <br />ment in use levels among concessioners would be made in <br />full cooperation with all companies considering historical <br />use and other factors. <br /> <br />8ased on monitoring, other management actions such as <br />regulations establishing new operating procedures to <br />minimize impacts might be implemented. Management <br />actions including temporary closure of attraction sites, <br />prohibiting camping at certain sites, changing launch <br />schedules, and adjusting trip lengths might also be <br />considered. <br /> <br />If these proposed management actions are significant, the <br />Colorado River Management Plan will have to be modified. <br />In this case, monitoring results, along with proposed plan <br />modifications will be provi,ded to the public. After public <br />comments are received and considered, the plan will be <br />modified as necessary and these modifications will be Widely <br />distributed. <br /> <br />17 <br /> <br />.- <br />
The URL can be used to link to this page
Your browser does not support the video tag.