Laserfiche WebLink
<br />j, <br /> <br />t' <br /> <br />13~S <br /> <br />IV. Update existing and develop additional computer programs. <br /> <br />1. North Platte Syatem (Wyoming-Nebraska Stateline) [RO] <br /> <br />a. Adapt existing University of Wyoming Program to Burec <br />computer <br /> <br />b. Update study period to 1977 <br /> <br />2. Point flow study <br />a. Update South Platte River (Denver to Julesburg) [RO] <br /> <br />b. Apply to North Platte River (Whalen Dam to Lewellen) [GI] <br /> <br />3. Narrows Reservoir Operation Study [RO] <br /> <br />a. Acquaint staff with program <br /> <br />b. Update and extend study period to cover 1941-1946 & 1966-1977 <br /> <br />c. Reprogram if required <br /> <br />d. Estimate Project Water Requirements <br /> <br />e. May be desirable to modify so that operation of the Weld <br />County Reservoir may be simulated <br /> <br />4. Develop streamflow simulat.ion capability for: <br /> <br />a. North Plat.te River, Whalen Dam to Lewellen [GI] <br /> <br />b. South Platte River, Kersey to Julesburg [RO] <br /> <br />5. Existing Platte River Operations Model (Lewellen/Julesburg <br />to Overton) [GI] <br /> <br />a. Extend to Duncan, Nebraska <br /> <br />V. Define Potential Plans for Supplying Future Demands. (to be <br />accomplished jointly with other planning disciplines) <br /> <br />1. Wyoming [RO] <br />2. Colorado [RO] <br /> <br />3. Nebraska [GI] <br />