My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10420
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10420
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:12:51 PM
Creation date
10/12/2006 4:19:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8143.800
Description
John Martin Reservoir
State
CO
Basin
Arkansas
Date
1/1/2001
Author
SEO
Title
Report of the State Engineer Concerning Accounting of the Operations of an Offset Account in John Martin Reservoir for Colorado Pumping 2001
Water Supply Pro - Doc Type
Publication
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />. <br /> <br />December 1, 2001 <br /> <br />Report of the Colorado State Engineer <br /> <br />Offset Account Operations <br /> <br />November 1,2000 to October 31,2001 <br /> <br />An Offset Account in John Martin Reservoir was authorized by the Resolution <br />Concerning an Offset Account in John Martin Reservoir for Colorado Pumping <br />dated March 17, 1997 ("Resolution") and by the Resolution Concerning an Offset <br />Account in John Martin Reservoir for Colorado Pumping As Amended March 30, <br />1998 ("Amended Resolution"). <br /> <br />This report summarizes the operations conducted using the Offset Account for the <br />period November 1,2000 through October 31,2001 and has been prepared pursuant <br />to paragraph 11 of the Amended Resolution. <br /> <br />At 0000 hours, November 1, 2000 the Offset Account contained 1059.10 acre-feet. <br />From November 1,2000 through October 31,2001 there were deliveries to and' <br />releases from the Offset Account as summarized in the tables below. On March 31, <br />2001, 500 acre-feet of fully consumable water was delivered to the Offset Account to <br />satisfy the Storage Charge prerequisite for using the account for another year. Copies <br />of the correspondence describing this delivery are included in Section 3. <br /> <br />In Section 1, a monthly summary of the contents of the Offset Account is provided in <br />Table 1. A summary of the subaccounts of the Offset Account is provided in Tables A <br />through 8.2. The outline preceding the tables in Section 1 provides an explanation of <br />the purpose of each subaccount. <br /> <br />Section 2 of this report contains the daily accounting records, by month, for all <br />subaccounts in the Offset Account. <br /> <br />From November 1,2000 through October 31,2001, there were three deliveries of <br />water to the Offset Account, including the delivery of 500 acre-feet of fully consumable <br />water to satisfy the Storage Charge. These deliveries are summarized in the following <br />table. <br /> <br />Source Delivery End Date Amount to Offset Net Consumable Net Return Flow <br /> Account tac-ftl Waler tac-ft\ Waler (ac-ftl <br />LAWMA (Article II) March 31. 2001 1688.11 1000.00 688.11 <br />LAWMA (Article II) Auousl 10, 2001 1100.98 500.00 600.98 <br />LAWMA (Highland Canal October 31. 2001 1.928.85 1,928.85 0.00 <br />Shares) <br />TOTALS 4.717.94 3.428.85 1289.09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.