Laserfiche WebLink
<br />Month <br /> <br />~ <br /> <br />Jan. <br />Feb <br />March <br />April <br />, May <br />';-' June <br />July <br />August <br />Sept <br />Oct <br />Nov. <br />Dec. <br /> <br />i <br /> <br />~ <br /> <br />WEIGHTED MONTHLY SALINITIES AT <br />SELECTED COLORADO RIVER STATIONS I' <br />AND RUNNING 12-MONTH NIB-INPERIAL FLOW-WEIGHTED SALINITY DIFFERENTIAL <br />(in parts per million) <br /> <br />o <br />= <br />>-" <br />c..: <br />:.c <br />C<J <br /> <br /> Below Below Palo Verde At At Northerly Inter- <br />Hoover Dam Parker Dam Canal Near Blvthe Imoerial Dam national Boundary <br />5-Year 5-Year 5-Year 5-Year 5-Year <br />avg.f' avg.21 avg.f' avg.f' avg,f' <br />1974-78 2002 2003 1974-78 2002 2003 1974-78 2002 2003 1974-78 2002 2003 1974-78 2002 2003 <br /> <br />Running <br />12-Month <br />Flow-WId, <br />Differential" <br />2002 2003 <br />. <br /> <br />690 582 623 709 600 665 751 613 648 913 708 711 1,041 856 891 139.1 143,5 <br />675 611 640 706 608 627 732 615 636 835 676 700 998 839 798 147,0 137-3 <br />684 605 601 699 608 621 727 549 629 805 675 679 925 783 787 152,2 137,7 <br />680 600 615 700 609 628 714 607 631 801 658 680 892 781 777 157,7 134,9 <br />677 595 621 698 602 625 709 617 633 822 679 723 962 .871 878 157,6 131).8 <br />678 600 621 695 604 712 625 812 684 711 956 855 844 157,7 127,2 <br />682 610 688 607 709 625 797 684 909 821 159,3 <br />690 606 686 609 706 616 800 701 907 828 156.1 <br />672 603 686 612 737 619 815 699 952 820 151,8 <br />680 603 689 602 739 603 854 711 1,070 899 146,3 <br />682 609 692 609 746 614 897 719 1,010 850 142,1 <br />681 609 702 615 731 629 877 756 999 887 140.9 <br /> . <br /> <br />General Notes: <br /> <br />1/ Salinities based on "sum of constituents" <br /> <br />~/ 5-Year averages are arithmetic <br /> <br />'JI 12-month flow-wei9hted differential between NIB and Imperial Dam through month shown in left column. <br />