Laserfiche WebLink
<br />c) <br />C::;, <br />("'') <br />'-'"'l <br /><:.) <br />N <br /> <br />Release No.2 began at 0800 hours, July 10 at a rate of 500.00 c.f.s. A <br />transit loss release of 150.00 c.f.s. was begun at the same time. The tran- <br />sit loss release was reduced to 50 c.f.s. at 0900 hours, July 13, and to 0 <br />at 0900 hours, July 16. The 500.00 c.f.s. release was cancelled at 0900 <br />hours, July 16. <br /> <br />Release No.3 began at 0900 hours, July 20, at a rate of 500.00 c.f.s. No <br />transit loss water was released. The 500.00 c.f.s. release was cancelled <br />at 1330 hours, July 28. <br /> <br />Release No.4 was begun at 1100 hours, Aug. 9 at a rate of 400.00 c.f.s. <br />No transit loss water was released. The release was increased to 500.00 <br />c.f.s. at 1100 hours, August 15. A 500.00 c.f.s. release rate was main- . <br />tained until 0900 hours, Sept. 29, when it was cut to 300.00 c.f.s. At <br />1000 hours, Oct. 1, the release was cancelled. <br /> <br />TABLE XVII <br /> <br />Releases and Delivery to State Line 1984 <br /> <br /> Transit Loss <br />Month. Deriulnd . . Added StilteLine* Credited* Delivery <br />June 23818.53 3273.17 23658.00 22855 -963.53 <br />July 17582.91 1202.50 34797.00 25701 8118.09 <br />~ugust 21149.07 22927.00 22179 1029.93 <br />September 29107.86 31092.00 29898 790.14 <br />OCtober . .247;94 6413 4364 4116.06 <br />TOTALS. 91906.31 104997 13090.69 <br /> <br />* Includes Flow at Frontier Ditch. <br />** Computed per Agreement of March 6, 1984. <br /> <br />;1. <br />