|
<br />.
<br />
<br />.
<br />
<br />G :: ::AB1
<br />
<br />TABLE 3. PROJECT PUMPING STAGES 3, 4, & 5
<br />
<br />YEAR I STAGE 3 I STAGE 4 I STAGE 5 I TOTAL
<br />1986 744 0 0 744 AF
<br />1987 2,676 0 0 2,676 AF
<br />1988 6,497 0 0 8,497 AF
<br />1989 20,388 0 0 20,388 AF
<br />1990 18,155 0 0 18,155 AF
<br />1991 14,343 0 0 14,343 AF
<br />1992 9,142 9,114 0 18,256 AF
<br />1993 8,017 13,036 9,090 30,143 AF
<br />1994 4,764 9,546 5,699 20,009 AF
<br />1995 6,127 6,484 3,142 15,753 AF
<br />1996 6,355 8,938 4,455 19,747 AF
<br />1997 9,491 12,998 5,909 28,397 AF
<br />1998 9,037 9,671 4,572 23,280 AF
<br />1999 5,554 7,107 2,634 15,295 AF
<br />2000 5,207 3,360 1,613 10,179 AF
<br />TOTAL = 128,497 80,254 37,113 245,863 AF
<br /> AVERAGE 1986.2000 = 16,400 AF/YR
<br />
|