My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10355
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10355
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:58:29 PM
Creation date
10/12/2006 4:17:27 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies (Alpha, not Basin Related)
State
CO
Basin
Rio Grande
Water Division
3
Date
5/21/2001
Author
USFS Dept of Ag
Title
Schedule of Proposed Actions - (SOPA) for the Rio Grande National Forest and San Luis Resource Area
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,. <br /> <br />WIMPS Watershed Improvements. This project will conduct an environmental analysis for the Scoping <br /> various me1bods of protecting soil, waler and fIsheries resources through land and needed. <br /> other trealments. Check dams, bank stabilization, revegetation, soil aeration, soil <br /> stabilization, fIsh struciures, and other techniques will be analyzed. JOHN <br /> RAWINSKI, Suoervisor's Office, (719) 852-5941 <br /> <br />RECREATION <br /> <br />ASPEN GLADE Reconstruction of parts of existing campground units, !WO loilels, Scheduled for <br />CAMPGROUND upgrade the water system, minor road improvement work. No contract fall <br />REHABILITATION exPansion. T33N, R6E, Section 26. JIM HONG 274-8971 2001 <br />TRUJILLO MEADOWS Complete construction of cattle exclosure fence around Trujillo 200 I, 2002 <br />CAMPGROUND FENCE Meadows Campground. T32N, R5E, Section 5, Contact JIM construction. <br />EXCLOSURE HONG, (719) 274-8971 <br />TUCKER PONDS Partnership project designed to improve handicap fIshing Scoping compleled. <br />HANDICAP opporlunities by inslalling fIshing piers, interpretive Projecl implementation <br />ACCESSIBILITY signs and hardening trail. DALE GOMEZ (719) 657- planned for summer of <br /> 3321 Divide Ranoer District. 2001. <br />MIDDLE FORK FRISCO AND Parrnership project designed to reduce impacts to riparian NEPA completed. Project <br />3D-MILE RIPARJANIHORSE areas by providing horse facilities (hitchrails, corral.. .). implementation planned for <br />FACILITY PROJECf DALE GOMEZ or RONNIE DAY (719) 657-3321 Divide summer of 200 1. <br /> Ran2er District. <br />MIX LAKE HANDICAP Project to improve accessibility at Mix Lake. May include hardened Scoping needed. <br />ACCESS PROJECf ail, fIshing pier, inslallation of accessible loilet. SUE SWIFf- <br />IIMILLER, (719)274-8971. <br />TRUJILLO MEADOWS 1Pr0ject 10 improve accessibility at Trujillo Meadows. May include Scoping needed. <br />HANDICAP ACCESS PROJECl ~ardened tail, fIshing pier, installation of accessible loilet. SUE <br /> SWIFT-MILLER. (719) 274-8971. <br />FOREST WIDE TOILET [To replace eighl deleriorating vaulllOilets in four campgrounds wilh NEP A in progress. <br />REPLACEMENT ~ccessible toilets at Buffalo Pass CG, Poso CGfPA, Park Creek CG, and <br /> fhe lower loop at Aspen Glade CG. GREG THOMPSON, (719) 852- <br /> 5941. <br />
The URL can be used to link to this page
Your browser does not support the video tag.