Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />October 21, 1983 <br /> <br />Mr, J.F. Rinckel, projects Manager <br />U. S. Bureau of Reclamation <br />Grand Junction Projects Office <br />764 Horizon Drive <br />Grand Junction, CO 81501 <br /> <br />Dear J .R,: <br /> <br />We have reviewed your preliminary summary sheet on the Lower <br />Gunnison Basin Unit--North Fork area. Based on the estimated <br />salt loads from the Soil Conservation Service, it appears that <br />this area deserves study as a potential salinity control <br />project. I support your proposed effort. <br /> <br />I would encourage your staff to review the work done on the <br />Tongue Creek area by the Colorado Soil Conservation Board, It <br />may have some applicability to the North Fork area, <br /> <br />I am designating Dan Law a$ our planning team representative <br />for this study, All materials and notices should be sent to <br />him, If we can be of assistance on this study, please feel free <br />to contact Dan, <br /> <br />Sincerely, <br /> <br />-. <br /> <br />rwJl <br /> <br />J. William McDonald <br />Director <br /> <br />JWM/gl <br /> <br />cc: Dick Johnston, ewCB <br />Monte Pascoe, Salinity Control Forum <br />David Robbins, ewCB <br />David Getches, DNR <br />Herschel Burgess, Grand Mesa WCD <br />Carton Meek, Fruitland Mesa WCD <br />Alan McDermith, North Fork WCD <br />Henry Hamilton, Crawford WCD <br /> <br />301 <br />l/jr <br /> <br />OQcn~l <br />