Laserfiche WebLink
<br />o <br />C) <br />... <br />(;l <br />Cd.;! <br />"""' <br /> <br />Table <br /> <br />1 <br />2 <br />3 <br />4 <br />5A <br />5B <br /> <br />5C <br /> <br />6 <br /> <br />TABLES <br /> <br />Reservoir Data <br />1996 Monthly Summary of Blue River Operations <br />1996 Actual Project Operations <br />Flood Damage Prevented in 1996 <br />1997 Project Operating Plan Under Most Probable Water Supply Condition <br />1997 5BProject Operating Plan Under Reasonable Minimum Water Supply <br />Condition <br />1997 Project Operating Plan Under Reasonable Maximum Water Supply <br />Condition <br />Annual Operating Plan Studies of Green Mountain Reservoir for Water Year <br />1997 <br />