My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10325
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:58:21 PM
Creation date
10/12/2006 4:16:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272.100.60
Description
Colorado River Basin Salinity Control Forum
Basin
Colorado Mainstem
Water Division
5
Date
10/1/1999
Author
CRBSCF
Title
Supplemental Report on the 1999 Review - Water Quality Standards for Salinity - Colorado River System
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />...... <br /><.0 <br />l-" <br /> <br />Price Wellington Control Board <br />643South 200 East <br />Price. Utab 84501 <br />(435) 637-7610 <br /> <br />August 19. 1999 <br /> <br />lack BamcI~ Exec;utive Director <br />Colorado River Salinily Control Forum <br />106 West SOO SOIlIh, Suite 101 <br />Bountiful, Ut. 84010 <br /> <br />Dear Mr. B8l1ICIt; <br /> <br />Subject: BQIP Funding <br /> <br />Tltis Icller is wriucn in suppan ot Ihe findings ortlte Colorado River Salinity Conlrollriennial review <br />repon. The repor1 deaailcd tile progress of lbe Forum in implementing salinily control ptactices wilhin <br />tile Colot1ldo River Basin. .Our organi_.alion fully supports the adoplion and application of programs of <br />the Bureau of Reclamation, and USDA programs, and basin S1ales cost sbaring prograrns bavc benefited <br />millions of downsltCam waler ~rs of lhe CoJor~do River, bmlhere is much more work IcJllo be <br />accomplished 10 reduce salinily levels. <br /> <br />OUI orllanizlIIion suppoltS ac<<lellluon of the salinity control programs. CSpccially in gelling the USDA <br />portion of the program 10 adequate fundillJ levels of lwelve mlllion dollars per year from the EQIP <br />program. Local ptoduclcrs an: ready, willing and able to install s.1lillity control practices, if adequate <br />financial and Icchnical assistance is availabk:. II will tlkc a strong USDA funding comlnilmenllo keep <br />up the pro~ made by lhe Forum to dale. and inlhe Mure to mecllhe water qlllllily criteria for the <br />lower basin staleS. <br /> <br />Sincerely, <br /> <br />w~ IJ~ /If~ <br /> <br />Will. Dale Madus <br />President, Price Wellington Control Board <br /> <br />27 <br /> <br />~c <br />
The URL can be used to link to this page
Your browser does not support the video tag.