Laserfiche WebLink
<br />'. <br /> <br />FY 93 Annual Project Report <br />Colorado River Recovery Program <br /> <br />I. Recovery Program Project Number: 18-9 <br /> <br />II. Title of Project: Early biology studies-investigations on effects of flow, <br />temperature, and other environmental variables on the early biology of selected <br />fishes in the Green River system. <br /> <br />III. Principal Investigators: <br /> <br />Kevin R. Bestgen, Robert T. Muth <br />Larval Fish Laboratory <br />Colorado State University <br />Fort Collins, CO 80523 <br />303-491-1848 <br /> <br />IV. Study Schedule: <br /> <br />A. Initial- year: <br />B. Final year: <br /> <br />FY 91 <br />FY 93 <br /> <br />V. Relationship to RIPRAP'. <br /> <br />Green River Mainstem-/.A.1.a and /.Aa.b. (Provide and protect instream <br />flows-habitat management; Green River above Duchesne River; initially <br />_identify year-round flows needed for recovery while providing experimental <br />flows; summer/fall and winter/spring). /.A1.c. (Provide and protect instream <br />flows-habitat management; Green River above Duchesne River; initially <br />identify year-round flows needed for recovery while providing experimental <br />flows; summer/fall; review summer/fall flow recommendations), /.A2.b.1. <br />(Provide- and protect instream flows-habitat management; Green River above <br />Duchesne River; state acceptance of initial flow recommendations; <br />winter/spring; review scientific basis), /.A.3.a. (Provide and protect instream <br />flows-habitat management; Green River above Duchesne River; deliver <br />identified flows; operate Flaming Gorge pursuant to the Biological Opinion to <br />prOVide-summer and fall flows), /.A3.b. (Provide and protect instream flows- <br />habitat management; Green River above Duchesne River; deliver identified <br />flows; operate Flaming Gorge Dam to supply winter and spring test flows), <br />/.A.3. c. (Provide and protect instream flows-habitat management; Green <br />River above Duchesne River; deliver identified flows; operate Flaming Gorge <br />Dam to provide winter and spring flows and revised summer/fall flows, if <br />necessary),I.B.1. (Provide and protect instream flows-habitat management; <br />Green River below the Duchesne River; initially identify year-round flows <br />needed for recovery while providing experimental flows), /I.A.1.a.4. (Restore <br />habitat--habitat development and maintenance; Old Charlie Wash; monitor <br /> <br />1 <br />