My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10294
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:58:10 PM
Creation date
10/12/2006 4:15:11 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.107.A
Description
Basalt Participating Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
3/1/1973
Title
Summary Sheet - Basalt Project - Colorado
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ~\~ "', <br /> ','" ~," ;-", <br /> "' ;',',) <br />PROJECT COST <br />Construction $34,217,000 <br />Operation, maintenance, and replacement 101,000 <br />BENEFITS <br />Municipal and domestic $1,301,100 <br />Domestic irrigation 910,800 <br />Irrigation 195,800 <br />Total $2,407,700 <br />BENEFIT-COST RATIO 1.12:1 <br /> Per- <br /> Non- cent <br /> reim- of <br /> Reim- burs- repay- <br /> Total bursable !Ek ment ~ <br />Municipal and domestic 18,475,000 18,475,000 0 54 51 <br />Domestic irrigation 13,367,000 13,367,000 0 39 41 <br />Irrigation 2,375,000 2,375,000 0 ...l -2. <br />Total 34,217,000 34,217,000 0 100 101 <br /> <br />AGRICULTURAL ANALYSIS <br /> <br />Cost per acre <br />Recommended water charge <br />Percent repaid by local people <br /> <br />11 <br />'7:1 <br />II <br /> <br />PROJECT ADMINISTRATION <br /> <br />Contracting entity--Basalt Water Conservancy District <br /> <br />SPECIAL EFFECTS <br /> <br />Environmental involvement--for environmental consideration the Landis <br />Pipeline was changed from a grade line through the National Forest to an <br />alignment along the Roaring Fork River through private land except for <br />one or two short stretches of Forest land. Costs were included to re- <br />vegetate disturbed areas. This route along the river is more expensive <br />and was selected to avoid any scars that would have occurred from follow- <br />ing the alignment around the mountain side. <br /> <br />Political consideration--the Ruedi Reservoir of the Fryingpan Arkansas <br />Project was built specifically as replacement storage for water diverted <br />to the Eastern Slope and for other water resource developments. The <br />Basalt Project would permit the Western Slope to beneficially use some <br />of their entitlement. <br /> <br />11 Cost allocation on Basalt Project no available. <br />11 The gradual shift from commercial irrigation to residential <br />irrigation makes it exceedingly difficult if not impossible to estimate <br />a meaningful figure, for this category.' <br />
The URL can be used to link to this page
Your browser does not support the video tag.