Laserfiche WebLink
<br />0213 <br /> <br />31. Graphs showing median fecal-colifonn, fecal-streptococci, and total-colifonn bacteria concentrations and median <br />fecal-colifonn concentrations by streamflow regime in the Arkansas River, April I 99{}-March 1993.................... 65 <br /> <br />TABLES <br /> <br />I. Selected surface-water sites in the Arkansas River Basin and water-quality constituents measured or <br />analyzed between April 1990 and March 1993 ...................................................................................................... 4 <br />2. Least-squares regression equations for dissolved-solids concentration and specific conductance for selected <br />sites in the Arkansas River Basin, April I 99{}-March 1993 .................................................................................. 12 <br />3. Least-squares regression equations for hardness and specific conductance for selected sites in the <br />Arkansas River Basin, April199{}-March 1993..................................................................................................... 14 <br />4. Results of Wilcoxon rank-sum test (I-tailed) of pre-treattnent (April 199{}-March 1992) and <br />post-treattnent (April I 992-March 1993) instantaneous streamflow and cadmium concentrations at <br />selected sites in the upper Arkansas River Basin ................................................................................................... 18 <br />5. Number of samples that exceeded acute and chronic cadmium water-quality standards in the <br />upper Arkansas River, April I 99{}-March 1993..................................................................................................... 19 <br />6. Average percentages of instantaneous streamflow and instantaneous total-recoverable copper load <br />contributed to the Arkansas River by the upstream main-stem site and the intervening tributaries in the <br />same reach, April I 99O-March 1993...................................................................................................................... 21 <br />7. Results of Wilcoxon rank-sum test (I-tailed) of pre-treatment (April I 99{}-March 1992) and <br />post-treatment (April 1992-March 1993) instantaneous streamflow and copper concentrations at <br />selected sites in the upper Arkansas River Basin ................................................................................................... 22 <br />8. Number of samples that exceeded acute and chronic copper water-quality standards in the upper <br />Arkansas River, April I 99O-March 1993............................................................................................................... 22 <br />9. Average percentages of instantaneous streamflow and instantaneous total-recoverable iron load contributed <br />to the Arkansas River by the upstream main-stem site and the intervening tributaries in the same reach, <br />April 199{}-March 1993 ................................. ........................... ............................................................................ 25 <br />10. Results of Wilcoxon rank-sum test (I-tailed) ofpre-treaunent (April I 99{}-Marcb 1992) and <br />post-treattnent (April 1992-March 1993) instantaneous streamflow and iron concentrations at <br />selected sites in the upper Arkansas River Basin ................................................................................................... 25 <br />11. Number of samples that exceeded chronic iron water-quality standards in the upper Arkansas River, <br /> <br />April I 99{}-March 1993 . ........................................... ........................... .................................................................. 26 <br />12. Average percentages of instantaneous streamflow and instantaneous total-recoverable lead load <br />contributed to the Arkansas River by the upstream main-stem site and the intervening tributaries <br />in the same reach, April 199{}-March 1993............................................................................................................ 28 <br />13. Results of Wilcoxon rank-sum test (I-tailed) of pre-treattnent (April 199{}-March 1992) and <br />post-treattnent (April I 992-March 1993) instantaneous streamflow and lead concentrations at <br />selected sites in the upper Arkansas River Basin ................................................................................................... 29 <br />14. Number of samples that exceeded acute and chronic lead water-quality standards in the <br />upper Arkansas River, April I 99{}-March 1993..................................................................................................... 29 <br />15. Average percentages of instantaneous streamflow and instantaneous total-recoverable manganese load <br />contributed to the Arkansas River by the upstream main-stem site and the intervening tributaries in the <br />same reach, April I 99O-March 1993...................................................................................................................... 32 <br />16. Results of Wilcoxon rank-sum test (I-tailed) of pre-treatment (April I 99{}-March 1992) and <br />post-treattnent (April 1992-March 1993) instantaneous streamflow and manganese concentrations at <br />selected sites in the upper Arkansas River Basin ................................................................................................... 32 <br />17. Number of samples that exceeded chronic manganese water-quality standards in the <br />upper Arkansas River, April I 99{}-March 1993..................................................................................................... 33 <br />18. Average percentages of instantaneous streamflow and instantaneous total-recoverable zinc load <br />contributed to the Arkansas River by the upstream main-stem site and the intervening tributaries in the <br />same reach, April 1 99O-March 1993...................................................................................................................... 35 <br />19. Results of Wilcoxon rank-sum test (I-tailed) of pre-treaunent (April 199{}-March 1992) and <br />post-treatment (April I 992-March 1993) instantaneous streamflow and zinc concentrations at <br />selected sites in the upper Arkansas River Basin ................................................................................................... 36 <br /> <br />CONTENTS V <br />