Laserfiche WebLink
<br /> <br /> <br /> INDIAN CLAl.__ SUMMARY UPDATE JANUAR:. .L989 <br /> . TOTAL <br /> POTENTIAL PRESENTLY NEGOTIATED INDIAN SETTLE- <br /> INDIAN IRRIGATED IRRIGATED IRRIGABLE AMOUNTS U.S.B.R. MENT <br />STREAM CLAIMS INDIAN NON-IND. IND. LAND A.F. /YR PRIORITY PROJ. LAND LANDS NOTES <br />San Juan R. <br />(southwest) 22,707 640 1,600 A:F 1868 7,500 8,140 1/ <br />McE1mo Cr. 1,286 34 42,600 2/ <br />Mancos R. 42,814 335 11,700 8,400 25,800 A:F 1868 11,600 20,000 II <br /> (1985)* <br />La Plata R. 16,762 12,413 1,800 1,800 1/ <br />Animas R. 2,375 14,200 <br />Florida R. 1,800 835 21,500 545 1,090 A:F 1868 1,102 1,647 Y <br /> (1976)** <br />San Juan R. <br />(central) 2,201 2,100 <br />Los Pinos R. 13,130 43,200 1/ <br />Piedra R. 1,446 433 7,800 600 1,850 A:F 1868 600 <br /> 535 1,595 A:F 1868 535 <br /> 61 183 A:F 1868 61 2/ <br />San Juan R, (1976) ** <br />(East) 1,499 126 13,700 1,317 3,876 A:F 1868 1,317 1/ <br />Navajo R. 161 4,500 <br />Dolores R. 2,200 ~/ <br />TOTAL IN ACRES 93,051 14,893 175,913 34,100 <br /> <br />1/ Dolores proj: The Ute Mt. Tribe will receive 23,300 AF for irr., 1,000 AF for M&I, and 800 A:F for recreation <br />2/ Present non-Indian lands irrigated from the Dolores River <br />3/ Animas-La Plata Proj: The Ute Mt. Tribe will receive 26,300 A:F for irr. of 11,600 acres and 6,000 A:F for M&I; the <br />So. Ute Tribe will receive 3,400 A:F for irr. og 1,800 acres and 26,500 AF for M&I <br />4/ Florida proj: The Indians will receive 2,553 A:F for irr. of 1,102 acres including 835 acres presently irrigated <br />5/ The So. Ute Tribe received 213 cfs with an 1868 priority in 1930 to irrigate 16,966 acres including 31.3 cfs for <br />allotments <br />i/ The So. Ute Tribe will receive a storage right on Sto11steimer Cr. for 1,850 A:F with an 1868 priority/ and 1,850 A:F <br />refill with a 1986 priority to irrigate 600 acres, a direct flow right on the Piedra River to irrigate 535 acres with <br />an 1868 priority, and a direct flow right to irrigate 61 acres on Devil Cr. with a 1976 priority <br />7/ The So. Ute Tribe will receive 1,530 A:F from the San Juan R.; 975 A:F from Round Meadow Cr., and 1,371 AF from Cat Cr. <br />8/ The Dolores River is the source of supply for the Dolores Project <br />-* Subordinated 1868 to all rights adjudicated prior to January 1, 1985 <br />** Subordinated 1868 to all rights adjudicated prior to January I, 1976 <br />(The Tribes received a reserved project right for the Animas-La Plata and Dolores Projects with the date of priority <br />to be the same as the Projects', and are to share on a pro-rata basis with the Projects' users.) <br />