My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10277
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:58:05 PM
Creation date
10/12/2006 4:14:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8278.400
Description
Title I - Mexican Treaty and Minute 242
Basin
Colorado Mainstem
Date
1/1/1978
Author
IBWC
Title
Minute 242 Annual Report
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />". \::. )-;.. <br /> <br />. <br /> <br />STATUS REPORT FEBRUARY 1. 1979 <br />COLORADO RIVER BASIN SALINITY CONTROL PROJECT - Title I <br /> <br />Assistant Commissioner <br />Engineering and Research <br />USBR <br />February 15, 1979 <br /> <br />Authorization <br /> <br />1. IBWC K1nute No. 242 dated 'August 30, 1913 <br /> <br />2. Public Lav 93-320 - Title. I. June 24. 1974 <br /> <br />3. IBWC Minute No. 248 dated June la, 1975 <br /> <br />Construction Schedule: <br /> <br /> CompletioD Dates <br /> Special Report Scheduled <br />Malar Featurea September 1973 January 1979 <br />Coachdla Canal April 1977 <br />Reach lA Sept. 19BO <br />Reach IB June 19B1 <br />De8altln~ Complex <br />Irr18. Manag. Sya. June 1977 Aug. 1979 <br />Acreage Reduction June 1979 Dec. 1977 <br />On-Farm Measures June 1979 Sept. 1983 <br />HODE Siphon JUne 1975 June 1976 <br />Bypass Drain-U.S. June 1977 July 1977 <br />Bypass Drain-Mexico June 1977 June 1977 <br /> Upper Reach June 1977 <br /> Lower Reach June 1977 <br />Desalting Plant Dec. 1978 June 1984 <br />Protective Pump1nR Not included but <br /> authorized <br />6 wella Feb. 1978 <br />8 wells Nov. 1978 <br />7 \lella 1979 <br />7 vella 1983 <br />7 wells 1987 <br />Land acquisition Sept. 1977 <br /> <br />~: Final Environmental Statement filed with CEQ June 18, 1975. <br />FY80 tunds in the amount of $23.000,000 requested. <br /> <br />Funding <br /> <br />1. a. <br />b. <br /> <br />Total funds authorized - $155,500.000 <br />Amendatory legislation to increase authorized ceiling submitted <br />January 30, 1979. Increases ceiling to $333.382,000. <br /> <br />2. Pund! appropriated - FY75 (Oct. 74) - $26.000.000 <br />- FY76 - $18,085.000 <br />- TQ - $ 6,B70.000 <br />- FY77 - $42.600.000 <br />- FY78 - $14.290.000 <br />- FY79 - $10.798.000 <br /> <br />Remarks <br /> <br />Construction delayed due to funding limitations and repayment negotiations. . <br />Fish and wildlife mitigation studies completed. Construction vill be <br />separated into tvo contracts. Contract for Reach LA awarded. Design of <br />Reach 18 underway. Definite Plan Report scheduled for completion February 1979. <br /> <br />25.000 to 30.000 scres are under IMS scheduling. <br />Purchase totaling 6.200 acres has been completed. <br />99 contracts signed totaling 14,661 acres (Sept. 1979). 216 applications received. <br />Construction complete. <br />Construction complete. <br />Construction complete. <br />Constructiou complete. \ <br />Construction complete. <br />Design data being prepared. Desalting manufacturer testing completed. <br />Desalting membrane equipment contracts awarded. Status Report completed. <br />Definite Plso Report scheduled Nov. 1979. Final designs underway. <br />Staged construction - 6 wells, 8 wells. 7 wells. 7 wells, and 7 wells. <br />Special Report being prepared ... 1n lieu of the Definite Plan Report. <br />Well and access road construction completed. Contracts completed on pumP!. motor!. <br />conduit, etc. <br />Contract for 8 wells completed. Contrscts awarded on pump8. motors, conduits. etc. <br />Contract for 7 wells ~arded Nov. 22. 1978. Pumps, motors. conduits, etc. Sept. 1979. <br />To be completed 8S needed to maintain Southern International Boundary flowS. <br /> <br />'" <br />5:l <br />H <br />'" <br />H <br />.., <br />W <br /> <br />.Condemnatlon proceedings filed June 1976. <br />
The URL can be used to link to this page
Your browser does not support the video tag.