Laserfiche WebLink
<br /> <br />~ <br />Cl <br />-- <br />~ <br />to 2 <br />N <br /> 3 <br /> 4 <br /> 5 <br /> <br />However, Alternatrve four ts the tentatryely recommended plan subject to <br /> <br /> <br />discuss ion wIth the 10ca 1 peop 1 e and can be used for eva 1 uat ton at th i s <br /> <br />'time. Alternative four can be effective in reducing the salt load from <br /> <br />on-farm irrigation by about 180,000 tons per year, and the. one-time <br /> <br />installation cost of system Improvements Is estimated at $18,500.000. <br /> <br />3 <br />