Laserfiche WebLink
<br />.. <br /> <br />A REPORT ON OPERATIONS FOR THE <br />SOLUTION OF THE INTERNATIONAL PROBLEM OF THE SALINITY <br />OF THE COLORADO RIVER UNDER HINUTE NO. 242 <br />FOR THE PERIOD <br /> <br />January 1, 1976 - December 31, 1976 <br /> <br />This report presents the results of operations under the agreement <br />incorporated in Minute No. 242 dated August 30, 1973, of the <br />International Boundary and Water Commission, United States and <br />Mexico, entitled "Permanent and Definitive Solution to the Inter- <br />national Problem of the Salinity of the Colorado River." The <br />operations began on June 25, 1974, immediately following approval <br />of the Enabling Legislation, Public Law 93-,320. This report <br />describes operations during the second full calendar, year from <br />January 1, 1976 through December 31, 1976. <br /> <br />This report is based upon the records of flows and salinities <br />secured jointly by the United States and Mexican Sections of the <br />International Boundary and Water Commission, the U.S. Bureau of <br />Reclamation, and the U.S. Geological Survey. Locations and fea- <br />tures referred to in this report are shown on the map Exhibit 1. <br /> <br />The records show that the United States operations were in <br />compliance with the agreement in Minute No. 242. <br /> <br />. <br /> <br />The Salinity Differential <br /> <br />Minute No. 242 provides in Point 1 that~ <br /> <br />"The United States shall adopt measures to assure that <br />. . . the approximately 1,360,000 acre-feet (1,677,545,000 <br />cubic meters) delivered to Mexico upstream of Morelos <br />Dam, have an annual average salinity of no more than <br />115 ppm + 30 ppm U.S. count (121 ppm + 30 ppm Mexican <br />count) o;er the annual average salinity of Colorado <br />River waters which arrive at Imperial Dam. . . " <br /> <br />The records show that operations during the calendar year 1976: <br /> <br />1) Colorado River water deliveries to Mexico upstream of Morelos Dam <br />amounted to: 1,460,739 acre-feet (1,801,807,000 cubic meters) <br /> <br />2) The average salinities of the waters a) delivered to Mexico <br />upstream of Morelos Dam and b) arriving at Imperial Dam and <br />c) the resulting salinity differentials were as follows: <br /> <br />. <br />