My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10185
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:57:39 PM
Creation date
10/12/2006 4:11:56 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8112.600
Description
Arkansas White Red Basins Interagency Committee - AWRBIAC -- Reports
Basin
Arkansas
Water Division
2
Date
6/1/1955
Title
Arkansas-White-Red River Basins - Part II - Section 7 - Hydroelectric Power Development of Utilization
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />c.' <br />N <br />QO <br />.... <br />~ <br /> <br /> <br />:~'.'/:~~. <br />. ',,;. 1 <br /> <br />PREFACE <br /> <br />The data, conclusions, and recommendations of this section <br />or the Arkansas, White and Red Basins Report have been largely fur- <br />nished by the Federal power Conmission (chairman agency), the Corps <br />of Engineers, and the Department of the Interior. Necessarily, be- <br />cause the data have been gathered over many years and proje,cts have <br />been formulated under different legislative d~ective8 and adminis- <br />trative policies, each of the agencies assumes full responsibility <br />for the material it furnished, for the basic estimate of the need to <br />be fulfilled by the possible development, and for the feasibility'of <br />the pl"ojects included. In this section, the material descriptive of <br />major existing and under construction pl"ojects has been compiled fram <br />data furnished by the project owners or constructing agency. Certain <br />material descriptive of authorized and previously recommended proj- <br />ects has been included in this section on recommendation of the prin- <br />, cipal investigative agency; further investigations or modification of <br />these projocts during the course of the AWR study, except as may be <br />noted in the more detailed discussions included in this report, have <br />been the responsibility of the pl"incipal investigative agency. Mate- <br />rial relative to the existing power supply and definitely scheduled <br />additions thereto and the past and estimated future power requirements <br />of the AWR power market region have been furnished, for the most part, <br />by the Federal Power Commission. Similarly, the estimated allocation <br />of the future power supply to subdivisions of the market region, the <br />transmission facilities necessary to deliver the potential hydroelectric <br />'power to suitable load centers, and the value of the potential power <br />have been furnished by the Federal Power Commission except for the <br />Colorado area, data for which was furnished by the Department of the <br />Interior. Project coats for the selected potential projects were fur- <br />nished by the principal irwestigative agency. The states and other <br />Federal agencies have rendered valuable assistance in carrying out <br />the study, both during the course of and for marv years prior to the <br />AWR studies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.