My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10185
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:57:39 PM
Creation date
10/12/2006 4:11:56 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8112.600
Description
Arkansas White Red Basins Interagency Committee - AWRBIAC -- Reports
Basin
Arkansas
Water Division
2
Date
6/1/1955
Title
Arkansas-White-Red River Basins - Part II - Section 7 - Hydroelectric Power Development of Utilization
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />'.. <br /> <br />o <br />c: <br />N <br />QO <br />N <br />CJl <br /> <br />I. SUMMARY <br /> <br />Introduction <br /> <br />i <br />~' 1. This chapter will summarize the pertinent points of <br />'&ion detailed throughout the remaining chapters of this sec- <br />('the AlfR report. For convenience, the summarization is di- <br />rD accordance with the chapter numbers and titling. <br /> <br />," <br />,~. <br />~:.- <br />,:j},;i~l Chapter II - Introduction <br />..~.,':'" <br /> <br />L";3Z;::,, 2. Chapter II cites the authority for the comprehensive <br />ir'!\ii$~irt on the Arkansas, White, and Rod River Basins and defines the' <br />:1 ;~je'ctive and discusses the general scope of this section. It also <br />:B4tlines the work procedures developed by the Arkansas-White-Red <br />, ~~~s~s Inter-Agency Committee in order to accomplish the objectives <br />:of this section. <br /> <br />Chapter III - Investigations <br /> <br />'3. This chapter presents in considerable detail the in- <br />vestigations which were made in'determining the ~droelectric poten- <br />tialities of the AWR Basins. The use of prior surveys and reports <br />in developing the plan is reviewed and a synopsis is given of the <br />information presented at public, hearings held in connection uith <br />studies of the ~dro potentialities of the basins. The results of a <br />survey of hydro power potentialities in the basins are outlined and <br />show that pertinent data were procured on approximately 60 existing <br />and potential ~dro projects with installations of 100 kw or over. <br /> <br />4. The paragraph on investigations of ~droelectric poten_ <br />tialities delineates the criteria by 'Ihich the power aspects of pre- <br />viously proposed and new hydro projects Were reappraised to determine <br />economic necessity, feasibility, functional adequacy, hydraulic <br />(insofar as possible) and electrical coordination in relation to <br />project design, operation, and ,cost. A general discussion is pre- <br />sented on the future development of the hydro potentialities of the <br />basins, particularly in regard to the means, responsibilitios, and <br />procedures whereby the projects could be constructed in compliance <br />lfith, existing Federal and State water lalis. <br /> <br />1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.