Laserfiche WebLink
<br />. <br /> <br />. CD <br />(\J <br />~ <br />~'J <br /> <br />. <br /> <br />. <br /> <br />Public benefits are based on 5% of direct benefits and represent the <br /> <br />benefits which are received by public interests such as schools, hospitals, <br /> <br />and churches because of the increased economic activity in the project area. <br /> <br />Public benefits are estimated at $52,000 annually for the project. <br /> <br />Pressurization benefits come from pressurizing the existing water supply <br /> <br />in project pipelines. These benefits were based on the value of pressurizing <br /> <br />the existing water supply. Pressurization benefits are estimated to be <br /> <br />$20,000 annually for the project. <br />