Laserfiche WebLink
<br />v <br /> <br /> <br />STATEMENT BY SENATOR ANDERSON OF NEW MJJ:,XICQ ON <br />STATUS OF COLORADO RIVER STORAGE PROJECT AND <br />PARTICIPATING P~OJJJ:CTS, ESPECIALLY WITH RESPECT <br />TO URGENCY OF 'DEJJINING POWER MARIU)TING AREi\. <br />OF PROJECT AND ,OTHER FACTORS, ON Ji\.NUAltY 27, 11160 <br /> <br />For the information of the Senate, I desire to mall:e a statement <br />supplementing myreq\J.est to ,have the thir<!. annual report of the <br />Pepartm.ent Of the Interior on the Colo)'a90 River storlJ,ge project <br />priilted as a 8enl1te d9gument, These annUal reports are reqmre!i <br />.by t4e l1utp.9l'izing !lct, . The tirst annulJ,1 report WaS printe<l as Senate <br />D, ocument 77, 85th Congress. A su,ppl,em"ep."t was p.] rin,te9 as S,' enate <br />P<.>cument 96. These reports dealt primarily with the h,Y<lrologic <br />basis for t'inancillJ and operating studillll, T4e sec<.>n<l aJlnual repnert <br />was'~Jintedllll Sllnate pocume!it S. 86t4 O<.>I1gr!l!lS, ' <br />I1efiite calling attll'n't!q)J.t<.> ~alient features <.>tthe third annual rep<.>rt, <br />which will become Senate DOcUIJlent 79, SQt4 (JQp.gress. :.!!i sessi<.>u, <br />J pre,sent to the Senate a pIlase of a problemrelatjJ;lg tQ t1;le C<.>lorado <br />nlYer stQr,ag, e pr<.>ject, }v,h, ich is vital tQ the fi,nan{lI!,1 an!i economic <br />phaslls <.>f the deyeloPm\'l.1t, <br /> <br />UR\1ENCY of S:m'T1NG U!, POWER M4-R'KETIN<;> ARE4- <br /> <br />This point relate.s to :the urgency for the 8ecretlliry,of tile Interi<.>r <br />to define the power-marketing area for the Colorado River st,ofllige <br />project. Preliminary di~cussions of bacll:bnene tranSnI!.ssi<,>,n line lAyouts <br />have been held by the BlIreau of Reclamation with the Upper Col!lf\v;lo <br />Preference Customers Gommittee, representiAg electric co<.>perative,s, <br />REA's, municipalities. and other Aonprofit pOWer JlSers in N eOW MexifUl, <br />Colorado, Utah, Wyoming, and Arizona,' , . <br />Mr, Norton Davis, of my State of New Mexico, is a leader of this <br />organization and has brought the subject to my attention, <br />Since the nonprofit power organizations will have preference in the <br />purchase of power frOm the producing units of the project. it is <br />imperati'{eth"t they know Interior's ideas as.to the markel>ing area, <br />and .thecos:t ot:power !from the Upper Colorado system as well as <br />coordination of river and power operations in the upper and lower <br />basins. <br />The Bureau of Reclamation has submitted a preliminary outline of <br />a backbone transmission line that would link the power_producing <br />units of Glen Canyon, ll'laming Gorge. and Curecanti and provide for <br />interconnections with the Davis Dam-Parker-Davis Dam system in <br />the Lower Colorado ar.,'a, Just how the system envisaged by Recla- <br />mation's preliminary o~tline would meet the needs of the preference <br />customers over a period pf20 years or more will depend on ,the market- <br />ing area which we are urging the Secretary of the Interior to define <br />without delay. Indicat~ons are the preference customem will be able <br />to substantiate claims to all firm power to be produced at the Upl'er <br />Colorll.'doproj ectuni ts, <br />