Laserfiche WebLink
<br /> <br />COLORADO RIVER STORAGE PROJECT <br /> <br />27 <br /> <br /> <br />COMMENTS ON THE BUnEAU'S FINANCIAL AND ECONOMic <br />ANALYSES. DATED FEBRUARY 1958 AND DECEMBER 1958 <br /> <br />The first financial and economic analysis of the Colorado River <br />Storage Project and par,ticipating projects dated February 1958 was <br />transmitted to the Presi<ilent of the Senate on April 15, 1958, and was <br />published later as Senate'Document 101, Eighty-fifth Congress, second <br />session, In transmitting the analysis, the Secretary of the Interior <br />emphasized that, with Gonstruction just starting on initially sched- <br />uled units, the analysis was based largely on planning estimates with <br />such refinements as were possible in a few instances from detailed pre- <br />construction estimates and from bids on construction work, The <br />Secretary stated also that the analysis will be reviewed and revised <br />periodically as detailed il'vestigations and construction of the develop- <br />ment progress and as ne~ data becomes available, <br />The second economic fanalysis of the Colorado River Storage Proj- <br />ect find participating prpjects datcd December 1958 is a supplement. <br />to the first report, It primarily incorporates changes in the rate and <br />schedule of developmeI;lt, The basic assumptions and procedures <br />used in preparing the first analysis were also used for the second <br />analysis, ' <br />Our observations and'comments on certain aspects of the financial <br />and economic analyses follow: <br /> <br />Increase in construction cost estimate <br />The Bureau of Reclamation estimated the cost of the Colorado <br />River Storage Project arid participating projects as $933,660,000 when <br />the ,Congress was considering passage of the Oolorado River Storage <br />Project Act, approved .Npnl11, 1956. In Its lcebruary 1958 analYSIS, <br />construction costs of authorized projects Were estimated by the <br />Bureau to total $992,174,000, <br />In the December 1958 analysis, this estimltte had been increased <br />by $11,376,000 and totaled $1,003,550,000, The $11,376,000 increase <br />consists of. $1,849,000 re,presenting the cost of additional recreational <br />facilities at the Flaming Gorge and Navajo storage units and $9,- <br />527,000 representing the; net increase in costs of participating projects <br />summarIzed as follows: : <br /> <br />Project <br /> <br />InereastOr <br />.1)ecrea8e(~) <br /> <br />PaonilL___~~____________~~..____~_.___n__u_ $680,000 <br />Pine Rlver Extens10n___"n____un__________~ -5,294,000 <br />ffi:i~~rid~~~::: =:: =:::::: ::: :::: ::::::::::::: ~~~; ~~~ <br />SOlldskadee. ~ .~___._n___._______.____________ 12, -us, 000 <br />TotaLrun___un_n_____n____________ $9,527,000 <br /> <br />The Pine River Extellsion Project has been determined to be eco- <br />nomically infeasible arid is not scheduled for construction, The <br />$12,415,,000 increase inlthe cost of the Seedskadee, Project is based <br />on a Definite Plan Report dated November 1958, In this report, a <br />dam and reservoir for storage are recommended in place of the pre- <br />viously recommended diversion dam, The report also recommends <br />"wildlife refuge costing $1,070,000 and recreational facilities not in- <br />eluded in the previous a;nalysis, <br /> <br />50566-60-6 <br />