<br /> <br />24 <br /> <br /> <br />COLORADO RIVER STORAGE PROJECT <br /> <br />Investigations work was in pro!jl'ess on the participating projects <br />at June 30, 1959, These investigatiOns consisted primarily of advance <br />planning for t4e purpose of formulating firm development plans and <br />pre~aring cost ~stimates and repayment studies for those participating <br />projects giveujlriority for construction byt4e Bureau and the int,er- <br />ested states, These investigations are discussed on pages 46 through <br />",0 of this rel?ott, <br />,The Paoma 'Project was initially authorized for construction by <br />. Presidential appro'Val March 18, 1939. Owing to subsequent findings, <br />changes in the original plan were made in 1940 and 1946. The project <br />was reauthorized by the !lct of June 25, 1947 (61 Stat. 181), to give <br />effect to these changes, but the storage features of the project were <br />not constructed, The Colorado River Storage Project Act reauthor- <br />ized Paonia asa partiCipating project. <br />As a result of detailed investigations, t4e Pine River Project Exten- <br />sion was declared economically infeasible and plalis for its construc- <br />tion have been! abandoned. <br /> <br />TENTATIVE AL~OCA'1'ION OF TOTAL ESTIMATED <br />CON/?TRUCTION i COSTS TO PURPOSES <br /> <br />The total estimated construction costs of the Colorado River Storage <br />Project and partiCipating projects excluding interest duringconstruc- <br />tion is $1,003,550,000. This estimate, as shown in the financial and <br />economic analjsis, dated December 1958, is the latest official estimate <br />of the Bureau i of Reclamation and cooperating agencies, The esti- <br />mated constru<,ltion costs by individual unit and participating project <br />and the alloca~ions to purposes are as follows: <br />