My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10165
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:57:35 PM
Creation date
10/12/2006 4:11:34 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
1/26/1960
Author
USDOI
Title
Third Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />,CONTENTS <br /> <br />GENERAL COMMENTS_ _ _ _ _',__ ___ ___________________u______ _________ <br />Summary of principal (indings___________n_ __ ____n__u"____ ____-'- <br />Financial and economic analyses of the Colorado River Storage <br />Project and participating projects_________________________ <br />Significant ohanges in project plans have occurred since author- <br />ization and unu~ually long period is required for repayment .of <br />the Governmen~'s investment in power of the Collbran Project, <br />Colorado~____;____________________________________~____ <br />Project beneficiar{es are not required to reimburse the Govern- <br />ment for investfuation costs financed from the Colorado River <br />Development Fund_ ________ __ __ ___ ___________________n_ <br />Accounting and fi~ancial policy _ _ _ _______~_ ___________~_____ <br />COLORADO RIVER STORAGE; PROJECT AND PAR'l'ICIPATION PROJECTS_____n <br />Authorization by the Oongress_ _ __ _______ __ __,_________ _________ <br />Stor~&e P~oject-~i---------------_------------------------- <br />PartlClpatmg proJ~cts_ __ _ __ __ __ _______ __~_____________ _____ <br />Tentative allocation of total estimated construction costs to purposesn <br />Repayment of constru~tion costs allocated to reimbursable purposesu <br />Comments on the Bureauls financial and economic analyses dated <br />February 195!3 and December 1958_________________________n_ <br />Increase in constrtlction cost estimates_____ _________ _n__n_ <br />Repayment of co4struction costs _ _ _ _ _ _ _ _ _ ~ _ _ _ _ _ _ _ _ _ = _ _ _ _ _-_ __ <br />Electric power ge~eration____ ___ __ _ _ __ __ _~___ __ ___ _______n_ <br />Estimates of ,water supply at Glen Canyon site_____n_____ <br />Water releas~s required to meet lower basin conm~itments-- <br />Market for ppwe'r produced__________~___________:_--n-- <br />Determinat~O:n of firm energy p.roduction_ _ ____ ___________ <br />Determinatidh of nonfirm energy production_ _ _ _ _ _ _ _ _ _ _ _ __ <br />Interest rates usea in the analyses_ __n______________________ <br />Federal Power Commission appraisal of engineering and hydraulic" <br />criteria used hi repayment analyses to estimate firm power <br />capabilities ane( anticipated power revenUes_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ <br />Financing proje(\t con~truction and operation and maintenance costsn <br />Construction activities to June 30l 1959__________________________ <br />Glen Canyon______________________________________________ <br />Glen Canyon briQge_ _ _ _ _ _______ __ _____ __ ~_ _______ __ __ __ ___ <br />Glen Cargon hou'sing_ _____________________________________ <br /> <br />l!i:E~}~;s~~~;;~j;~~~~~~~:~~:::::~:::~:~:~:~:~:~::~:~:~::~ <br /> <br /> <br />Pai'ticipating projects_ __ _______ __ __ ___ ~_____ ______________ <br /> <br />COLLBRAN PROJECTl COL<?RADO_____ _______ _________ __ __ __ ___ _______ <br />Significant changes in project plans have-occurred since authorization_ <br />Rep~;yment of constrqction costs allocat.ed to reimbursable purposes__ <br />Unusually long period required for repayment of the Govern. <br />rnentls investr4ent in power_______n________nH_________~ <br />Sixty-one years r$quired to repay power investment if firm power <br />can be sold for18.8 mills a kwh___n_____n_______________~ <br />Sale of firm nower at 8.8 mills a kwh for-an extended period of <br />time seeme unlikely in view of future availability of lower <br />cost power______ ___ _______ ___ _ ___ _____ ____ __ __ -_ ____ <br />Possible integration of power operations with other Bureau projects__ <br /> <br />17 <br /> <br />;i. <br /> <br />!';"_l <br /> <br />" <br /> <br />Page <br />19 <br />20 <br />20 <br /> <br />21 <br /> <br />21 <br />21 <br /> <br />22 <br />22 <br />23 <br />23 <br />24 <br />26 <br /> <br />27 <br />27 <br />28 <br />28 <br />28 <br />29 <br />29 <br />30 <br />30 <br />30 <br /> <br />31 <br />31 <br />33 <br />34 <br />34 <br />35 <br />36 <br />36 <br />37 <br />37 <br />38 <br />38 <br />38 <br />39 <br /> <br />40 <br /> <br />40 <br /> <br />40 <br />41 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.