Laserfiche WebLink
<br />, ':0 <br />:'-.1 <br />"3" <br />C'J <br />l~) <br /> <br />non-reimbursab~e. This amount amortized in a 50-year period at 3 percent <br />interest, is equivalent to an annual cost of ~;58,300. Forty percent of the <br />estimated annual operation and maintenance costs of $3,400 are also a proper <br />charge to flood control. The tota1 annual charge to flood control is, <br />therefore. $61,700. <br /> <br />'-.I 23. The estimat~ mean annual increase in gross crop income to the <br />irrigators that will result with the regulation of the Conejos River flows <br />by the 60,000 aore-foot Platoro Reservoir, considering development of the <br />entire project area of 91,650 acres, is $1,526,000. With such a develop- <br />ment, the annual amount available for water charges ~ the Conejos Water <br />Conservancy District would be $0.71 per acre, or a total of :;;65,100. Should <br />the water users elect to retire the Class 5 and 6 lands now irrigated in <br />favor of a more complete and intensified development of Class 1, 2, and :3 <br />lands, the amount available for water charges within the District would <br />increase materially. ConSidering the development to include only Class 1, <br />2, and 3 landS, and assuming that desired changes in cropping praotioes ha~ <br />been obtained, the amount available for water charges may reasonabl;y be <br />expected to be $1.71 per acre annually. The amount available f'rom the <br />62,280 acres of Class 1, 2, and :3 lands within the District, on this basis, <br />would then be 1;106,500 annually, The operation of the 60,000 acre-foot <br />Platoro Reservoir will rl;lsult in an average annual reduction of 063,400 in <br />flood damages in the Conejos area. <br /> <br />24. The foregoing is summarized in tabular form, <br /> <br />Platoro Reservoir (60,000 aore..feet oapacity), <br />Total estimated cost, Maroh 1947 <br />Allocation: <br />Reimbursable--Irrigation, 60 percent <br />Non-re1mbursable--Flood Control, 40 percent <br /> <br />Reimbursable Annual Cost--Irrigation <br />(1) Construction <br />(2) Operation and Maintenance <br /> <br />(4) Annual Amount available for water Charges <br /> <br />Non-reimbursable Annual Cost-.Flood Control <br />(3) Construction <br />(2) Operation and Maintenance <br /> <br />Annual Reduction in Flood Damages <br /> <br />:;;3,750,000 <br />$2,250,000 <br />(;;1,500,000 <br />t. 56,250 <br />',? <br /> 5.100 <br />(i 61,350 <br />(. 65,100 <br />,? <br />/' 58,300 <br />..:) <br /> 3.400 <br />$ 61,700 <br />(p 63,400 <br /> <br />(1) One-fortieth of reimbursable costs. <br />(2) Annual reservoir operation and maintenance costs of <br /> <br />6 <br />