Laserfiche WebLink
<br />') <br /> <br />. <br /> <br />. <br /> <br />'" <br /> <br />19,000 cfs. Releases for the remainder of August 1996 are expected <br />to remain at this level, while those for September through November <br />will gradually drop to a daily average of about 12,000 cfs. A <br />special release during the Labor Day weekend is currently planned <br />to allow aerial and video photographic mapping of the Grand Canyon. <br />Releases on August 31 through September 2 will be 8,000 cfs <br />constant flow to accommodate this work. <br /> <br />For the next year or two, releases to equalize storage between <br />Lakes Powell and Mead are expected to control the annual release <br />volume from Lake Powell. This will likely result in releases <br />greater than the minimum objective release of 8.23 MAF (10 to 11 <br />MAF are expected under average inflow assumptions) . <br /> <br />The final consultation meeting regarding the 1997 Annual Operating <br />Plan for the Colorado River system reservoirs will be held <br />September 4, 1996, in Las Vegas. For further information contact <br />Randall Peterson at (801)524-5571. <br />