Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />,0881 <br /> <br />APPENDIX <br /> <br />Esti...ted Costs of >>evelop.ent'for aecreation <br /> <br />(Based on pres.ntly proposel1prillary operation plans <br />of ~es.rvoir) , <br /> <br />Access Road. (fI'OIl reservoir opera tion road or relo-, <br />cated highway, assUM1ng gravel but <br />not hard surface, and including e$- <br />ti...ted right-of-way cost) - - ~ - $19,200 <br /> <br />Parking Development ~ - - - - - - - 1,500 <br /> <br />Picnic Area (including tables, fire grates, <br />garbage units)- - - - - - - - - - - - 2,500 <br /> <br />Pit Toilets, 2 @ $600 - - - - - - - - - - - <br /> <br />LandSCaping (including site clearing, grad- <br />ing,planting, signs, Darriers, <br />paths, etc. - - - - - - - - - - - - - <br /> <br />1,200 <br /> <br />2,000 <br /> <br />Potable Water Supply Facilitie, (assuming <br />a tie-in with an existing or relocated <br />city~source main, or a well with hand <br />pUllp)- - - - - - - - - - - - - - - - - <br /> <br />Boat Launching Ramp (for use wi thin the <br />normal irrigation fluctuation range) - <br /> <br />lIiscellaneous <br /> <br />1,000 <br /> <br />3,000 <br />600 <br />$31,000 <br /> <br />Subtotal - <br /> <br />Contingencies (10%) <br /> <br />3,100 <br /> <br />Subtotal - - - - - - - <br /> <br />$34,100 <br /> <br />Plans, surveys; and supervision of con- <br />struction (approximately 25%)- <br /> <br />Total Estimated Cost of Development for <br />Recreation - - - - - - - - - - <br /> <br />~,500 <br /> <br />$42,600 <br /> <br />APPENDIX G <br />Exhibit No.1 <br />Pagll 22 of,';4 <br /> <br />- ~" }-' <br /> <br />---'". ,- <br /> <br />,-'<Ii:h",-",.' <br /> <br />. <br /> <br />"~ ! <br /> <br />