Laserfiche WebLink
<br />Ne.... acceas roads <br />Existing accelS roads to be <br />uPll:rsded <br />345-kV double-circuit trans- <br />ra.ission line <br />230-kV single-circuit trans- <br />ra.ission lines <br />46-kV transmission lines <br />S....itchysrds <br />Substations <br />Total aeneratiD.II: cspacity <br />Totsl annusl. net eneray <br />Totsl conlltruction costll <br />Annual increlllental net <br />benefits.!/21 $1.000 <br />II January 1983 price level; includes engineering, <br />2/ Net benefits are for the power increment only. <br />storage powerplant, the current Federal discount rate of <br /> <br />Feature <br />Syar Tunnel <br /> <br />Sysr Penstock <br /> <br />Syar Po....erplant <br /> <br />Fifth Water Reservoir <br /> <br />Fifth Wster Dsm <br /> <br />Fifth Water Dike <br /> <br />Fifth Yater Penstocks <br /> <br />Fifth Yater Putnped-Storage <br />Powerplant <br />Fifth Water Discharge Tunnels <br /> <br />Fifth Water Access Tunnel <br /> <br />Fifth Wster Access Shaft <br /> <br />Fifth Water Ventilation Shaft <br /> <br />Syar Reservoir <br /> <br />Syar Dam <br /> <br />Corona Aqueduct <br /> <br />Sixth Water Penstock <br /> <br />Sixth Water Powerplant <br /> <br />Sixth Water Reservoir <br /> <br />Sixth Water Dam <br /> <br />Dyne Aqueduct <br /> <br />Dyne Penstock <br /> <br />Dyne Powerplant <br /> <br />Monks Hollow Reservoir <br /> <br />Honks Hollow Dam <br /> <br />Honks Hollow Powerplant <br /> <br />D1utond Fork Pipeline <br /> <br />Diamond Fork Powerplant <br /> <br />Wasatch Aqueduct <br /> <br />Hayes Reservoir <br /> <br />Hayes Dala <br /> <br />COIIlparison <br /> <br />Unit <br />Capscity (cfs) <br />Diameter (feet) <br />Lenltth (IIlUes) <br />Capacity (cis) <br />OiaJlleter (feet) <br />Lenltth (feet; <br />Capacity (MW <br />Annual enerllY (KWh) <br />Total cspacity (acre-feet) <br />Surface area at nODllllI water <br />surface elevation (scru) <br />Height (feet) <br />Material volume (cubic yards) <br />Height (feet) <br />Material volume (c.ubic vards) <br />Number <br />Capacity (cis) <br />01ameter (feet) <br />LenSl.th (mUes) <br />Capacity (HW) <br />Annual enerllY (HWh) <br />Number <br />Capacity (ds) <br />Diaaleter (feet) <br />Len th miles <br />Diameter feet <br />Lenath (miles) <br />Width (feet) <br />Heiaht (feet) <br />Diameter (feet) <br />Hdllht (feet) <br />Total capacity (sc.re-feet) <br />Surface area at normal water <br />surface elevation (acres) <br />Height (feet) <br />Material volume (cubic yards) <br />Capacity (ds) <br />Diameter (feet) <br />Lenllth (miles) <br />Capacity (ds) <br />Diameter (feet) <br />Lenllth (miles) <br />Capacity (HW) <br />Annual enerllY (MWh) <br />Total capacity (sere-feet) <br />Surface area at nODllllI vater <br />surfsce elevation (aeres <br />Height feet) <br />Material volume (cubic yards) <br />Capacity (ds) <br />DilUlleter (feet) <br />Lenllth (milea) <br />Capacity (cfs) <br />OilUlleter (feet) <br />LenRth (miles) <br />Capacity (HW) <br />Annual enerllY (HWh) <br />Total capacity (acre-feet) <br />Surface area at normal water <br />surface elevation (acres) <br />Height (feet) <br />Material volume (cubic yards) <br />Capacity (MW) <br />Annual enerllY (KJh) <br />Capacity (eta) <br />Diameter (feet) <br />Lenll:.th (miles) <br />Capacity (MW) <br />Annual enerSl.Y (KWh) <br />Capacity (eta) <br />Diameter (feet) <br />Lenll:.th (miles) <br />Total capacity (acre-feet) <br />Surface area at normal water <br />surfac.e elevation (acres) <br />Height (feet) <br />Material volume (cubic yards) <br />LenRth (miles) <br /> <br />LenSl.th (miles) <br /> <br />LenSl.th (miles) <br /> <br />Len th <br />Len th <br />Number <br />NWllber <br />IIW <br />IIWh <br />$1.000 <br /> <br />(miles) <br />miles) <br /> <br />Summary Table 1 <br /> <br />of alternatives <br />Fifth Yater <br />Pumped <br />Storalte <br />800 <br />10.5 <br />5,' <br />800 <br />7.00 <br />1.130 <br />26 <br />76.857 <br />49,720 <br />530 <br />320 <br />5,000.000 <br />75 <br />185.000 <br />2 <br />5,OM <br />22.4 <br />,7 <br />1,105 <br />-226.110 <br />2 <br />5,004 <br />23.0 <br />'.1 <br />2,0 <br />I.' <br />40 <br />1.742 <br />15.0 <br />1.742 <br /> <br />31,414 <br />360 <br />250 <br />155.000 <br />'.6 <br />39.640 <br />450 <br />'.0 <br />6.' <br />6.8 <br />19.280 <br /> <br />22.4 <br /> <br />15.8 <br /> <br />8.5 <br /> <br />8.0 <br />4 <br />1 <br />1.147.4 <br />-90.333 <br />1.118.000 <br /> <br />Sixth Water <br />Flow <br />ThrOUJlh <br />600 <br />8.00 <br />6,0 <br />600 <br />7.00 <br />1.100 <br />lb,L <br />4~ <br /> <br />1,000 <br />32 <br />88 <br />942.000 <br />1.600 <br />12.50 <br />" <br />1,600 <br />10.00 <br />1,400 <br />89.9 <br />132:1'IO'"'- <br />1,250 <br />32 <br />150 <br />S78.000 <br />600 <br />8.50 <br />2.6 <br />600 <br />7.00 <br />,5 <br />-U..\. <br />132.630 <br />23,200 <br />288 <br />215 <br />1.939,000 <br />7.r <br />29:no <br />450 <br />',0 <br />6.' <br />.1...8 <br />17,910 <br /> <br />20.2 <br /> <br />19.1 <br /> <br />',5 <br />4,7 <br />5 <br />1 <br />149.7 <br />361.390 <br />362.200 <br /> <br />Sixth Water <br />Pump" <br />Stora/te <br />600 <br />9.50 <br />6.0 <br />600 <br />8.00 <br />1.100 <br />14.5 <br />~ <br /> <br />4,400 <br />70 <br />138 <br />4,408.000 <br />3,460 <br />17.00 <br />., <br />3,460 <br />13.50 <br />1.400 <br />196.6 <br />1r.T1!Il"" <br />620 <br /> <br />20 <br />125 <br />351.000 <br />3,460 <br />17.00 <br />2.6 <br />3,460 <br />15.00 <br />,5 <br />J~;3~ <br />31,414 <br />360 <br />250 <br />3.091.000 <br />'.6 <br />39,li4O" <br />450 <br />',0 <br />6,' <br />..2...L <br />17.910 <br /> <br />20.2 <br /> <br />'19.1 <br /> <br />J.5 <br />.7 <br />5 <br />1 <br />422.6 <br />259.330 <br />713.000 <br /> <br />90.500 14.000 <br />overhead, and service facilities. <br />These figures were cOlllputed using a 17 percent plant <br />7 7/8 percent, and are for plan formulation only. <br /> <br />8-3 <br /> <br />29.100 <br /> <br />1964 DPR <br />400 <br />8.00 <br />6.0 <br />400 <br />6.75 <br />1.100 <br />10.5 <br />49.240 <br /> <br />9JO <br />32 <br />88 <br />810.000 <br />1,600 <br />12.50 <br />., <br />1,600 <br />10.00 <br />1.400 <br />90.0 <br />131.970 <br />1,020 <br />" <br />150 <br />510,000 <br />600 <br />8.50 <br />2.6 <br />600 <br />7.00 <br />,5 <br />33.0 <br />131,620 <br /> <br />200 <br />4.50-5.00 <br />10.2 <br />51,500 <br />680 <br />200 <br />5,963.000 <br />11.4 <br /> <br />16.3 <br /> <br />'.5 <br />1.4 <br />, <br />1 <br />133.5 <br />312,830 <br />358,000 <br />11.500 <br /> <br />factor for the pumped- <br /> <br />1!2.-)~ <br /> <br />No Power <br />875 <br />10.00 <br />4.2 <br /> <br />400 <br />7.25 <br />18.3 <br /> <br />4.7 <br /> <br />178.700 <br />