Laserfiche WebLink
<br />3. ALLOCATION OF FEDERAL INVESTMENr <br /> <br />Page 11 <br /> <br />Section 6 of the authorizing act states that upon completion of each <br />unit, participating project, or separable feature thereof, the Secre- <br />tary shall allocate the total cost (excluding any expenditure auth- <br />orized by Section 8 of this Act) of constructing said unit, project, <br />or feature to the various purposes authorized under Reclamation law. <br />Allocations have been made of the total investment andlor estimated <br />cost of the units and projects now authorized. All allocations are <br />tentative with the exception of Smith Fork Project on which a final <br />allocation report was prepared April 1968. <br /> <br />SUMMARY ALLOCATION OF INVESTMENT ANDIOR ESTlMATED COSTS <br />FOR UNrrS AND PROJECTS AUTHORIZED AS OF <br />JUNE 30, 1968 <br /> <br />Project costs other than Section 8 costs <br />Reimbursable allocations: <br />Irrigation Y <br />Power <br />~lunicipal and industrial water <br />Other <br />Total <br />Nonreimbursable allocations: <br />Flood control <br />Fish and wildlife <br />Recreation <br />Road relocation costs, Public Law 87-874 <br />Total <br />Other - Navajo Indian Irrigation Project gf <br />Total Costs Allocated <br /> <br />Section 8 costs <br />Fish and wildlife <br />Recreation <br />Total costs not allocated <br /> <br />TarAL <br /> <br />(Thousands) <br /> <br />Percent <br />of total <br />allocation <br /> <br />$ 494,225 <br />568,131 <br />127,943 <br />3 332 <br />}l,193;631 <br /> <br />$ 7,407 <br />54,897 <br />2,861 <br />~2 763 <br /> <br />17 00 <br />130 <br /> <br />34.4 <br />39.5 <br />8.9 <br />.2 <br />83.0 <br /> <br />.5 <br />3.8 <br />.2 <br />.2 <br />Ii:7 <br />12-3 <br />100.0 <br /> <br />$ 29,166 <br />44;735 <br />} 73_901 <br /> <br />$1,511,960 <br /> <br />!/ Includes $370,000 which will be deferred under the Act of July 1, 1932 <br />(47 Stat. 564) ($125,000 on Florida Project and $245,000 on upalco Unit <br />of the Central Utah Project). <br /> <br />sf Payment of construction costs within the capacity of the land to repay <br />shall be subject to the act of July 1, 1932 (47 Stat. 564). <br />