Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />OO~i85~ <br /> <br />UPPER COLORADO RIVER COMMISSION <br />Ray Building / Room 103 <br />366 South Fifth East Street <br />Salt Lake Oity 2, Utah <br /> <br />MEMORAN'DUM <br /> <br />To: <br /> <br />IvaI V. Gosl1n <br />Chief Engineer & Secretary <br /> <br />From: <br /> <br />Lewis B. Seward, Hydraul1c Engineer <br /> <br />Subject: <br /> <br />Water Supply San Juan R1ver Basin <br /> <br />Attached is the study of the Water Supply San Juan <br />IUver Basin made pursuant to your inlltructions. <br /> <br />This report contains information relative to the initial <br />sta,e of the San Juan-Chama Project, Navajo Dam, and the pro- <br />posed Animas-La Plata Project. <br /> <br />Particular attention has been paid to your request <br />for an independent study basedo.n an adverse stream-flow period <br />anp ut1l1zing assumptions and data that could be substantiated <br />by reference to their sources. <br /> <br />In conformity with your recent request for revision of <br />the study all references to any development of the San Juan-Chama <br />Project beyond its initial stage have been deleted. <br /> <br />-11- <br />