Laserfiche WebLink
<br />1. <br /> <br />2. <br /> <br />3. <br /> <br />4. <br /> <br />5. <br /> <br />1. <br /> <br />2. <br /> <br />3. <br /> <br />. <br /> <br />. <br /> <br />LIST OF TABLES <br /> <br />Priority Dates for Administration for <br />Selected Rights in the Colorado River Basin <br /> <br />Projected Natural-Flow Shortages Under <br />Full River Administration <br /> <br />Cost Estimate for the Orchard Mesa <br />Bypass Channel <br /> <br />Cost Estimate for the Orchard Mesa <br />Auxiliary Pumping Plant <br /> <br />Annualized Costs <br /> <br />LIST OF FIGURES <br /> <br />Grand Valley, Colorado, General Map <br /> <br />Diversion Capability and Related Priority <br />Status for Structures Affected by the <br />Orchard Mesa Check Dam <br /> <br />Detail of Check Structure and Proposed <br />Improvements <br /> <br />Page <br /> <br />7 <br /> <br />12 <br /> <br />17 <br /> <br />18 <br /> <br />19 <br /> <br />4 <br /> <br />5 <br /> <br />16 <br />