My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09972
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09972
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:56:46 PM
Creation date
10/12/2006 4:02:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/1/1984
Title
Monthly Progress Report - Aquatrain Project - May 1984
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />ry; <br /> <br />'-.;;' 5.2 ANTICIPATED JUNE EVENTS <br /> <br />:-.- <br /> <br />,.... <br /><.-', <br />(~; <br /> <br />Work on the engineering package will continue. <br /> <br />6.0 SUBTEAM: ENVIRONMENT/CORRIDOR/FEDERAL PERMITTING/ENERGY MANAGEMENT (Fite) <br />6.1 MAY EVENTS <br /> <br />Draft statements of work have been completed defining work to be done to <br />study possible industrial uses of Glenwood-Dotsero Springs, Dirty Devil <br />River, and Lower Virgin River saline water. The statements also contain <br />a schedule for work to be completed between now and December 1984. <br />Reclamation's Upper Colorado Regional Office and Grand Junction Project <br />Offi ce are currently revi ewing the statements. <br /> <br />The Interagency Agreement with the Forest Service has been finalized and <br />is now in the final review process. <br /> <br />CH2M Hill has completed a draft report on their study comparing C02 and <br />saline water coal Slurry pipelines from Price, Utah, to the Intermountain <br />Power Project. Reclamation and International Engineering Company are now <br />revi ewi ng that report. <br /> <br />Discussions were opened with potential industrial users of <br />Glenwood-Dotsero water including oil shale and coal mines, and other <br />interests. <br /> <br />6.2 ANTICIPATED JUNE EVENTS <br /> <br />On June 7, Fite will meet with Upper Colorado Regional Office and Grand <br />Junction Project Office personnel to finalize statements of work on <br />possible industrial uses of Glenwood-Dotsero water. Investigation of <br />these uses will be started. <br /> <br />The Interagency Agreement with the Forest Service is anticipated to be <br />signed in June. <br /> <br />Statements of work on possible industrial uses of Lower Virgin River <br />saline waters will be finalized with the Lower Colorado Regional Office. <br /> <br />7.0 SUBTEAM: PLANNING COORDINATION/REPORTS/PUBLIC INVOLVEMENT (Stefanec) <br />7.1 MA Y EVENTS <br /> <br />Reclamation continues to defer broad public involvement activities <br />pending a better description of the nature of the project. <br /> <br />,- <br />/~. .' <br />," ,r-/ <br />Act 1 ng , Proj ect <br /> <br />/ <br /> <br />\-, <br /> <br />;- <br />Manager <br /> <br />Enclosure <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.