Laserfiche WebLink
<br />.' <br /> <br />o <br />o <br /><::> <br />.~ <br />w <br />w <br /> <br />SAN JUAN-CHAMA <br />WATER ACCOUNTING <br />ALBUQUERQUE PROJECTS OFFICE <br />MAY 1994 <br /> <br />The natural inflow into Heron Reservoir during the month of May was computed to <br />be 700 acre-feet (af) as shown on Table 3. Net San Juan-Chama losses were <br />660 af as shown on Table 2, There were 48,080 af of San Juan-Chama water <br />diverted through Azotea Tunnel during May, <br /> <br />There was no San Juan-Chama release from Heron for the month of May, <br /> <br />A summary sheet is provided for water delivered from Heron, El Vado, and Abiquiu <br />Reservoirs, <br /> <br />Total precipitation reported at Heron Reservoir for the month of May was <br />2,74 inches which is 167% of normal, The monthly computations for Heron <br />Reservoir are summarized in Tables 1-3, <br /> <br />Total inflow into Nambe Falls Reservoir was computed to be 3,540 af. Evaporation <br />loss on the reservoir was 8 af, Table 4 summarizes San Juan-Chama water at <br />Otowi. <br /> <br />Estimated sediment deposition in the San Juan-Chama pools at Cochiti, Abiquiu, <br />and Jemez Canyon Reservoirs are presented in Tables 5A-5C, <br /> <br />Storage and evaporation of Rio Grande water in El Vado and Abiquiu reservoirs are <br />shown on Table 6, <br /> <br />All data are provisional and subject to revision as final data are collected and <br />analyzed, <br />