Laserfiche WebLink
<br /> <br />Table l--Summary or Financial Analyses <br /> <br />Item <br /> <br />Installed pover sY8tem capacii;;y <kv) <br /> <br />Estimated project cost <*1,000) <br /> <br />'" <br /> <br />Allocations: <br />CoDDllercial pover <br />Irrigation !y <br />Municipal vater <br />Nonreimbursables <br />Others <br /> <br /><$1,000) <br /><*1,000) I <br /><*1,000) <br />(*1~000) <br /> <br />Criteria: <br />Interest on power investment <i) <br />Interest during construction <br />Cost allocation method <br /> <br />: <br /> <br />: <br />Mar,?h 1950 : <br />Interim Rate <br />'Schedule <br />Report <br /> <br />1954-55 <br />Economic and <br />Financial <br />Analysis <br /> <br />1958 <br />Economic <br />and Financial <br />Analys18 <br /> <br />I <br /> <br />January 1962 <br />Average Rate <br />and Repayment <br />study <br /> <br />. <br />. <br /> <br />2,365,810 <br />4,299,513 <br /> <br />: <br /> <br />: <br /> <br />2,434,400 <br />5,375,739 <br /> <br />2,441.,100 <br />5,848,383 <br /> <br />. <br />. <br /> <br />: <br /> <br />2,767,700 <br />5,838,946 <br /> <br />596,370 <br />2,286,033 <br />. 43,550 <br />1,373,560 <br /> <br />: <br /> <br />. <br />. <br /> <br />. <br />. <br /> <br />: <br /> <br />: <br /> <br />I <br /> <br />: <br /> <br />: <br /> <br />1,259,955 <br />2,531,925 <br />49,632 <br />1.',91.5,a::n <br />82,231 <br /> <br />: <br /> <br />. <br />. <br /> <br />: <br /> <br />. <br />. <br /> <br />.1,1.44,238 <br />2,235,749 <br />8,637 <br />1,849,576 <br />137,539 <br />" . " -.---.------- <br /> <br />1.,166,375 <br />: 2,726,539 <br />32,543 <br />1,846,772 <br />76,15't <br /> <br />. <br /> <br />: <br /> <br />. <br />. <br /> <br />. 3 : 3 3 : 3 <br />Excluded Included Included. Inc1.~ded <br />:Average or AJE and:Beparallle Costs- :Separable Costs- .~~parable Costs- <br />Priority or Use :Remainiug Benerits:Remaining Benerits:Remaining Benerits <br /> <br />Use or interest component on <br />power investment to aid <br />irrigation repayment <br />Pover cost assigned to irrigation <br />pumping ael"lTice <br /> <br />Findings: <br />Pover investment comp1.eted by: : <br />Pover repayment completed by: : <br />Irrigation investment completed by:: <br />Irrigation repayment completed by: : <br /> <br />Included <br /> <br />33i <br /> <br />1975 <br />19/39 <br />. mo9 <br />ro59 <br /> <br />: <br /> <br />. <br />. <br /> <br />: <br /> <br />. <br />. <br /> <br />Exc1.uded <br /> <br />Excluded <br /> <br />: <br /> <br />. <br />. <br /> <br />roi <br /> <br />22i <br /> <br />. <br />. <br /> <br />: <br /> <br />1970 <br />2>13 <br />2000 <br />2>67 <br /> <br />2000 <br />a:l22 <br />a:l25 <br />a:l97 <br /> <br />: <br /> <br />1!J Includes pumping poverassignment. <br />* Individual blocks of investment require more than 50 years. <br /> <br />Excluded <br /> <br />.J <br /> <br />: <br /> <br />18.7i <br /> <br />: <br /> <br />2000* <br />2>48* <br />a:l25 <br />2108 <br /> <br />: <br />