My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09943
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09943
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:56:37 PM
Creation date
10/12/2006 4:02:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8442.900
Description
Missouri Basin - Pick Sloan Project - Project Funding
State
CO
Basin
South Platte
Water Division
1
Date
7/1/1978
Title
Review of Repayment Status of Pick-Sloan Missouri Basin Program and Individually Authorized Projects Bureau of Reclamation
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I1frRODUCTIO)l <br /> <br />Thil report ia dedgned to provide the background infonution that ia <br /> <br /> <br />nece..ary to achieve au under. tanding of the Ki..ouri River Ba.in <br /> <br />Project froa the financial .tanclpoint. The nport eontaillll a brief. <br /> <br /> <br />._ary of the authorization of the project, set. forth criteria and <br /> <br />procedure employed through its evolving financial history, susaarizes <br /> <br />the, present financial situation, and di.cusses procsdures and criteria <br /> <br />proposed for ita future financial aanagement. Result. obtained by <br /> <br />follOWing these rec~ended criteria and procedures are included in <br /> <br /> <br />the report. <br /> <br />DESCRIPTIOtl AND A1l'tHORIZATION <br /> <br />The Mi.souri River Basin Project is . Bultiple-purpose water resource <br /> <br /> <br />developaent being undertaken jointly by the United States and the <br /> <br /> <br />States of the basin. The Departlllents of the Interior and Aray share <br /> <br /> <br />sajor responsibilities for action programs at the Federal level. <br /> <br /> <br />The Bureau of Reclamation haa been delegated a substantial portion <br /> <br /> <br />of the taak .aligned to the Secretary of the Interior. <br /> <br />The project conshta of about 150 divisions and unit. serving irrigation <br /> <br /> <br />and other purpose. along the aain stem and tributaries of the Missouri <br /> <br /> <br />River. The basin encampa.se. about one-fifth of the conterminous <br /> <br /> <br />United States and includes all or part of seven Reclamation States. <br /> <br /> <br />lncluded in the project for financial ~anagement and administration are <br /> <br /> <br />the uin-stem dama and powerp1ants conatructed by the Corps of Engineers, <br /> <br />I <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.