My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09943
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09943
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:56:37 PM
Creation date
10/12/2006 4:02:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8442.900
Description
Missouri Basin - Pick Sloan Project - Project Funding
State
CO
Basin
South Platte
Water Division
1
Date
7/1/1978
Title
Review of Repayment Status of Pick-Sloan Missouri Basin Program and Individually Authorized Projects Bureau of Reclamation
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />that the Lower Missouri Region shpuld be' able to update hydrology <br /> <br /> <br />data at' least once every 5 years'. Lower Missouri R~gion officials <br /> <br /> <br />informed us that the Region has b).ldgeted funds to do this. <br /> <br />Recommendation <br /> <br />To ensure that estimates of futur,e power revenues are based on the <br /> <br /> <br />best information readily available, we recommend that the Lower <br /> <br /> <br />Missouri Region prepare a current, hydrology study for use in the 1977 <br /> <br /> <br />repaym~Il~..Yt\l~Y' <br /> <br />Bureau comments <br /> <br />The Bureau stated that the Lower Missouri Region has initiated action <br /> <br /> <br />to complete a current hydrology study in fiscal year 1981 and plans <br /> <br />to update the study in accordanceiwith 730 DM 4. <br /> <br />'26 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.