My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09943
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09943
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:56:37 PM
Creation date
10/12/2006 4:02:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8442.900
Description
Missouri Basin - Pick Sloan Project - Project Funding
State
CO
Basin
South Platte
Water Division
1
Date
7/1/1978
Title
Review of Repayment Status of Pick-Sloan Missouri Basin Program and Individually Authorized Projects Bureau of Reclamation
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />cost allocation results in postponing repayment of a substantial <br /> <br />amount of Federal investment fro~ the period 2024 or before (when <br /> <br />power investment is to be repaid,! with interest) to the period 2061- <br />! <br />2137 wnen much of the future irri~ation investment is projected in <br /> <br />the PRS to be repaid, without interest. Power revenue requirements <br /> <br />are lowered accordingly, and the interest isred.uc.ed"1l1iltertally. <br /> <br />Als~ as a result of this method the Corps has for years allocated <br />, <br />! <br />annual O&M expenses of joint use ~acilities to irrigation although <br /> <br />most of these expenses are not related to any current irrigation oper- <br />.....-.._..-.. ----... ...___.___.._____..___~__.__,__ .._ . - .__ u_._ . _.,_ _ _________. <br /> <br />ations. For some reason these expenses are classified totally non- <br /> <br />i <br />reimbursable by the Corps, are nOf reflected in repayment studies, and <br /> <br />will not be repaid to' the'.Treasurir even as part of the irrigation <br /> <br />assistance to be recovered through power revenues. For fiscal year <br /> <br />1976 and the transition quarter, t\1e Corps accounts include the fOllOWing <br /> <br />O&M costs assigned to irrigation: <br /> <br />Corps Dam <br /> <br />O&~ 15-Month Total <br /> <br />Garrison <br />Oahe <br />Fort Peck <br /> <br />$720,275 <br />622,1.39 <br />560,799 <br /> <br />Total <br /> <br />1,903,213 <br /> <br />I <br />We were unable to identify throug1 Corps records the accumulated amount <br /> <br />of such expenses since Pick-Sloan!operations began which have been <br /> <br />classified nonreimbursable by theiCorps, but it is bound to be subs tan- <br /> <br />tial based on amounts shown previ9usly. The Bureau should request the <br /> <br />Corps to provide that information Iso that it can be appropriately used <br /> <br />, <br />I <br />in future repayment studies, shoul!d it be determined that such costs <br /> <br />are reimbursable by either power c~stomers or.irrigators. <br /> <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.