Laserfiche WebLink
<br />4933 <br />SOUTH METRO WATER SUPPLY STUDY <br />ALT. 1A, STATUS QUO <br />SUMMARY RATE & NPV RESULTS <br /> <br />Prepared by: RGA <br />Date: 2/18/2004 <br /> <br />[1 J NM is for "Not Meaningful" due to division by zero. Percent increase is over 1 O-year period. <br /> <br />2003 NPV. TOTAL PROJECT <br /> <br />O&M Costs <br />$503,850,000 <br /> <br />Periodic Repair <br />& Rehab Costs <br />$38,037,000 <br /> <br />Debt Service & <br />Construction <br />Costs <br />$1.011,700,000 <br /> <br />Total Project <br />$1,553.587,000 <br /> <br />Rick Giardina & Associates. South Metro Waler Supply Planning Study <br /> <br />Revenue <br />Requirements <br />$1,989,291,430 <br /> <br />Page 7-4 <br /> <br />. -'"" <br /> <br />) <br /> <br />.----- <br />