Laserfiche WebLink
<br />":'/_,~.,:o'_' <br /> <br />~ <br />w <br />. <br />C''.I <br />',') <br />\~ . <br />.... <br /> <br />RIO GRANDE COMPACT COMMISSION REPORT <br /> <br />52 <br /> <br />ERRATA <br /> <br />The minutes of the Sixth Annual (Sixteen) Meeting of the Rio Grande <br />Compact Commission state in part: <br /> <br />"--factual data used in the compilation <br />of reports of the Commission which factual <br />data had been revised and published by the <br />U. S. G. S. ----subsequent to use by the <br />Compact Commission in computing debits <br />and credits should be published in succeeding <br />reports of the Commission together with <br />proper explanatory notes. " <br /> <br />The Rio Grande Compact provides that the Annual Report of the <br />Commission for each calendar year shall be transmitted to the Governors <br />of the signatory states before March first of the following year. Although <br />every effort is made to furnish correct data to the commission for use in <br />their report, the limited time available to the collecting agency does not <br />permit a thorough analysis of the data and they are necessarily subject to <br />revision. <br /> <br />The Commission bases all computations of debits and credits on <br />volumes in thousands of acre-feet, expressed to the nearest hundred. A <br />check was made of all records published in these annual reports against <br />those published by the U. S. G. S. and it was found that in most instances <br />the changes were not of sufficient magnitude to affect the computations of <br />debits and credits; other changes were of items not used by the Commission; <br />but whenever a corrected value affected the computations of credits or <br />debits, such revisions have been published. The effect of changes or <br />revisions on the credits, debits or departures from normal release have <br />been adjusted from time to time by appropriate correction entries. <br /> <br />The figures shown below are the corrected values of runoff in acre- <br />feet for the period indicated. <br /> <br />Rio Grande near Del Norte, Colo. <br />1965 October 44, 690; November 21, 160, December 15,580; Annual 931,200 <br /> <br />Conejos River near Mogote, Colo. <br />1965 October 14, 190; November 27,770; December 4,790; Annual 334,800 <br /> <br />San Antonio River at Ortiz, Colo. <br />1965 October 178; November 271; Annual 30,670 <br /> <br />Los Pinos River near Ortiz, Colo. <br />1965 October 2, 110; November 1,380; Annual 127,800 <br /> <br />Conejos River near La Sauses, Colo. <br />1965 October 5,190; November 24,620; December 7,350; Annual 217,500 <br /> <br />Rio Grande near Lobatos, Colo. <br />1965 October 32, 300; November 36, 280; December 27, 500; Annual 498, 600 <br /> <br />..",.;~~-: -. ':=-';-'.'-'''&''- .~' ~ <br /> <br />