Laserfiche WebLink
<br />~ <br />- <br />~ <br /> <br />c <br /> <br />/. <br /> <br />Dominguez Reservoir Project <br /> <br />General Da,ta Shee,t <br />(March 1976) <br /> <br />A. Railroad relocation cos~ (January 1976 prices) <br /> <br />$19,000,000 <br /> <br />B. Gunnison River flow at Whitewater <br />(Average) <br /> <br />1,500,000 acre-feet <br />annually <br /> <br />C. Estimated Big Dominguez Creek flow <br />(Average) <br /> <br />7,000 acre-feet <br />annually <br /> <br />D. Average annual evaporation rate <br /> <br />3.5 acre-feet <br />acre <br /> <br />E. Storage requirements for different size peaking power operations. <br /> <br />Peaking capaci ty Length of Storage <br />in megawatts Operation in hours Required in acre-feet <br />300 4 1,125 <br />300 6 1,700 <br />300 8 2,250 <br />1,000 4 3,750 <br />1,000 6 5,600 <br />1,000 8 7,500 <br />2,000 4 7,500 <br />2,000 6 11,250 <br />2,000 8 15,000 <br />