Laserfiche WebLink
<br />," " <br /> <br />242 WELL FIELD LATERAL <br />LENGTH: 6.75 mi. pipeline and 5.25 mi. open canal <br />CAPACITY: 7.5 cfs at beginning to 220 cfs at terminus <br />20 wells have been constructed. 10 wells are currently able <br />to operate. Wells are drilled to depths of approx. 600-700 <br />ft. Each well is estimated to produce approx. 7.5 cfs. <br /> <br />WELLTON-MOHAWK MAIN CONVEYANCE CHANNEL (WMMCC) <br />Extends the length of the Wellton-Mohawk I. D. D.- approx. 72 <br />miles. Collects and conveys drainage from approx. 93 drainage <br />wells. Design Capacity is 353 cfs at terminus. Wellton- <br />Mohawk purchases power for pumping at 8.55 mils per kWhr. <br /> <br />MAIN OUTLET DRAIN (MOD) <br />starts at terminus of WMMCC near Gila River Siphon of the Gila <br />Gravity Main Canal and extends 8 miles to MODE 1. Design <br />Capacity is 353 cfs. <br /> <br />MAIN OUTLET DRAIN EXTENSION (MODE) <br />Starts at MODE 1 and extends 12 miles to MODE 3 near a point <br />just below Morelos Dam. Design Capacity is 353 cfs. <br /> <br />U. S. BYPASS <br />Starts at MODE 3 and extends approx. 16 miles to the Southerly <br />International Boundary with Mexico (SIB). Design capacity is <br />353 cfs. <br /> <br />MEXICAN BYPASS <br />Starts at SIB and extends 37 miles to the Santa Clara Slough <br />in the Gulf of California. Design Capacity is 353 cfs. <br /> <br />SITE <br /> <br />EC TO PPM CONVERSION FACTOR <br /> <br />Imperial Dam <br />Northerly International Boundary <br />Main Outlet Drain <br />242 Lateral <br />Yuma Valley Main Drain <br /> <br />.626 (Oct. 1991) <br />.631 (Oct. 1991) <br />.641 (Oct. 1991) <br />.501 (Jun. 1991) <br />.636 (Oct. 1991) <br />