My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09880
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09880
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:56:22 PM
Creation date
10/12/2006 3:59:54 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.750
Description
San Juan River General
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
6/1/1987
Author
Western Research Cor
Title
Economic Analysis of Potentially Irrigable Parcels in the San Juan West Watershed - June 1987
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I- <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />n~l~ '~7 <br />U~~~U <br /> <br />Estimated <br /> <br />Table 3-1 <br />Canopy and Brush Removal <br />by Land Category <br /> <br />Costs <br /> <br />Land <br />Category <br /> <br />Current Cost/Acre <br />(1985 Dollars) <br /> <br />Annualized <br />Cost/Acre <br /> <br />I <br />II <br />III <br /> <br />$35,00 <br />57.00 <br />95.00 <br /> <br />$3,00 <br />4.85 <br />8,10 <br /> <br />The second column of Table 3-1 is the estimated current cost per <br /> <br /> <br />acre for each clearing operation, The third column gives annualized <br /> <br /> <br />cost estimates over 50 years with an 8 3/8 percent discount rate, The <br /> <br /> <br />latter figures were used in adjusting preliminary repayment capacities <br /> <br />since they are also annualized, <br /> <br />It should be noted that the costs given in Table 3-1 do not <br /> <br />include costs for unskilled labor, This adjustment was made because <br /> <br />land clearing and preparation costs were assumed to be a construction <br /> <br /> <br />activity, The U,S. Water Resources Council (WRC) Principles and <br /> <br /> <br />Guidelines (1983) allow for the use of a zero opportunity cost for <br /> <br /> <br />unskilled labor in construction activities on water projects if the <br /> <br /> <br />project area is one of high unemployment, For purposes of this <br /> <br /> <br />analysis. it was assumed that the high unemployment assumption holds. <br /> <br /> <br />It should be noted that land leveling costs are not explicitly <br /> <br /> <br />addressed in either the Level A or Level B economic analyses, The <br /> <br /> <br />costs necessary to adapt an appropriate irrigation technology to the <br /> <br />contours of a parcel were incorporated in the agricultural engineering <br />analysis conducted by Boyle Engineering, <br /> <br />4 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.