My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09880
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09880
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:56:22 PM
Creation date
10/12/2006 3:59:54 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.750
Description
San Juan River General
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
6/1/1987
Author
Western Research Cor
Title
Economic Analysis of Potentially Irrigable Parcels in the San Juan West Watershed - June 1987
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />! I <br />I <br />I <br />I <br />I <br /> <br />001454 <br /> <br />All uncanopied rangeland is assumed to be covered with light to <br /> <br /> <br />medium growth of grasses and brush, <br /> <br /> <br />B. Costs of Brush and Tree Cover Removal <br /> <br /> <br />(1) Brush: according to Rick Gruen, CSU Ag Extension agent and Dan <br /> <br /> <br />Linn, Soil Conservation Service, Durango, the common method for <br /> <br /> <br />clearing grasses and brush in the area includes three operations; <br /> <br /> <br />chemical spraying, root plowing and chopping. The per acre costs for <br /> <br /> <br />these operations are as follows: <br /> <br /> <br />. chemical Spraying <br /> <br /> <br />Aerial custom rate - $ 4,OO/acre <br /> <br /> <br />2 quarts 2,4-D 8,25/acre <br /> <br /> <br />. plow, 14"- 16" deep - 10,OO/acre <br /> <br /> <br />. brush chopper - 20,OO/acre <br /> <br /> <br />$42,25/acre <br /> <br />(2) Tree Cover: <br /> <br /> <br />. crew comprised of 4 laborers, 2 dozer operators, and 1 foreman <br /> <br /> <br />Laborers-4 X $5,OO/hr. X 1,2 overhead = $24.00/hr. <br /> <br /> <br />2 acres/hr, accomplishment rate $ 12,OO/acre <br /> <br /> <br />Foreman- 1 X $5.DO/hr. X 1.2 overhead = $6,OO/hr, <br /> <br /> <br />2 acres/hr, accomplishment rate 3,DO/acre <br /> <br /> <br />(dozer operators included in custom rate) <br /> <br /> <br />. custom rental rate with operator <br /> <br /> <br />$85/hr., assume 2 dozers required at <br /> <br /> <br />2 acres/hr. accomplishment rate 85,OO/acre <br /> <br /> <br />$100,OO/acre <br /> <br />; , <br />h_..r <br />
The URL can be used to link to this page
Your browser does not support the video tag.