Laserfiche WebLink
<br />~ <br /> <br />. <br /> <br />. <br /> <br />Streamflow <br /> <br />Streamflow at key stations in the Colorado River System for January 1992 was <br />as follows: <br /> <br />February <br />Discharge <br />( 1000 a. f. ) <br /> <br />Percent <br />79 year <br />(1914-1992) <br />February <br />Discharl'.e <br /> <br />Cumulative Monthly <br />(Oct.-Feb.) <br />Discharge <br />(1000 a. f. ) <br /> <br />Percent 79 year <br />(1914-1992) <br />Cumulative Monthly <br />(Oct. -Feb.) <br />Discharl'.e <br /> <br />Colorado River <br />near Cisco, Utah <br />Adjusted f!1 <br /> <br />187. L <br />152.9 <br /> <br />91. 0% <br /> <br />881. 9 <br />723.5 <br /> <br />91.0% <br /> <br />Green River at <br />Green River, Utah <br />Adjusted bl <br /> <br />181. 3 <br />77.2 <br /> <br />69.5% <br /> <br />636.5 <br />370.7 <br /> <br />70.3% <br /> <br />San Juan River <br />near Bluff, Utah <br />Adjusted r:..1 <br /> <br />52.4 <br />38.9 <br /> <br />82.8% <br /> <br />258.0 <br />210.0 <br /> <br />81. 6% <br /> <br />TOTAL <br /> <br />420.8 <br />269.0 <br /> <br />82.5% <br /> <br />1,776.4 <br />1,304.2 <br /> <br />82.5% <br /> <br />Colorado River <br />at Lees Ferry g/ <br /> <br />785.2 <br /> <br />2,584.9 <br /> <br />f!/ Adjusted for change in storage in Blue Mesa Reservoir. Storage began in Blue <br />Mesa Reservoir October 27, 1965. <br /> <br />E/ Adjuste& for change in storage in Flaming Gorge and Fontenelle Reservoirs. <br />Storage began in Flaming Gorge Reservoir on November 1. 1962 and in Fontenelle <br />Reservoir in October of 1964. <br /> <br />r:=,1 Adjusted for change in Navajo Reservoir. Storage began June 27, 1962. <br />Not adjusted for San Juan-Chama diversions. <br /> <br />~/ Exclusive of Paria River discharge. <br /> <br />Power Disc.har.ge <br /> <br />Power generation at Colorado River Storage Project power plants for January 1992 <br />was as follows: <br /> <br /> Ge.neyating Generation Cumulative <br /> Units Megawatt Month of Monthly Generation <br /> Available Capability February (Oct. -Feb.) <br /> (Megawatt (Megawatt <br /> Hours) Hours) <br />Fontenelle I 9 16,237 22,701 <br />Flaming Gorge 2 90 110,435 161,397 <br />Blue Mesa 2 94 61,377 77,186 <br />Morrow Point 1 73 77,198 97,511 <br />Crystal 1 31 42,332 53,539 <br />Glen Canyon 7 980 815,592 1,164,552 <br /> 14 1,277 1,123,531 1,576,886 <br />